                                                                    column 1                                                 column 2
            Including amendments to 3 July 2017




                                                                Specific Outcomes                      Probable solutions (if code assessablecode
The Noosa Plan



                                                                                                                           assessment)
                                                                                                      AND
                                                                                                      S1.2 Construction works are designed and
                                                                                                      managed to restrict the extent of clearing and
                                                                                                      soil exposure to that necessary for access, and
                                                                                                      safe construction;
                                                                                                      AND
                                                                                                      S1.3 Clean stormwater is diverted or managed
                                                                                                      around or through the site without increasing the
                                                                                                      concentration of total suspended solids or other
                                                                                                      contaminants in the flow and without causing
                                                                                                      erosion (onsite or offsite);
                                                                                                      AND
                                                                                                      S1.4 Cleared areas are effectively stabilised
                                                                                                      prior to rainfall if works are delayed or works are
                                                                                                      not intended to occur immediately;
                                                                                                      AND
                                                                                                      S1.6 For buildings,
                                                                                                      a)     upstream runoff must be diverted around
                                                                                                             the construction site; and
                                                                                                      b)     sediment barriers are provided downslope
                                                                                                             of disturbed areas to prevent sediment
                                                                                                             washing into gutters, drains and
                                                                                                             watercourses either on or off the site; and
                                                                                                      c)     exposed soil and construction access
                                                                                                             must be managed in accordance with
                                                                                                             International Erosion Control Association
                                                                                                             Best Practice Erosion and Sediment
                                                                                                             Control (BPESC) 2008; and
                                                                                                      d)     temporary or permanent downpipes are
                                                                                                             connected to the stormwater system
                                                                                                             before laying the roof; or
                                                                                                      e)     localised erosion is avoided by directing
                                                                                                             flow from downpipes over non-erosive
                                                                                                             areas.
                                                  O2 Works in a watercourse                           S2.1 Work within waterways must be
                                                  Construction activities within watercourses are     undertaken in accordance with Best Practice
                                                  planned to prevent erosion, construction failure    Erosion and Sediment Control, Appendix I –
                                                  and associated sedimentation.                       Instream works, Sections 14 and 16
                                                                                                      International Erosion Control Association 2008.

                                                                                                      S2.2 Temporary vehicular crossings of
                                                                                                      waterways must be designed and constructed to
                                                                                                      convey flows for the 50%AEP event and remain
                                                                                                      stable for all rainfall events up to 10%AEP
                                                                                                      event.




                                                                                                    132
                                                                                     Erosion and Sediment Control Code

Used in these records

About this file

File size
18.9 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)(PDF, 18MB).pdf · 18.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.