Skip to the record
Mmm.. taste the original NoosaWatch™

Council archive · source document

2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)

of 907

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (18.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.

            Division 15—Erosion and Sediment Control Code




                                                                                                                 Including amendments to 3 July 2017
                                                                                                     The Noosa Plan
14.120 Erosion and Sediment Control Code
         The provisions in this division comprise the Erosion and Sediment Control Code. They
         are—
                compliance with the Erosion and Sediment Control Code (section 14.122);
                overall outcomes for the Erosion and Sediment Control Code (section 14.123);
                 and
                specific outcomes and probable solutions for the Erosion and Sediment Control
                 Code (section 14.124—14.125).

14.121 Compliance with the Erosion and Sediment Control Code
         Development that is consistent with the specific outcomes in sections 14.124 and 14.125
         complies with the Erosion and Sediment Control Code.

14.122 Overall outcomes for the Erosion and Sediment Control Code

14.122.1 The overall outcomes are the purpose of the Erosion and Sediment Control Code.

14.122.2 The overall outcomes sought for the Erosion and Sediment Control Code are the
         following—

a)    construction activities are managed to prevent erosion and sedimentation to offsite waters
      including stormwater, creeks and rivers;

b)    development facilitates erosion control, drainage control and sediment capture and
      treatment; and

c)    construction activities within watercourses are planned to prevent erosion, construction
      failure and associated sedimentation.

14.123 Specific outcomes and probable solutions for the Erosion and
       Sediment Control Code

14.123.1 The specific outcomes sought for the Erosion and Sediment Control Code are included in
         column 1 of Table 14-53. Probable solutions for code assessablecode assessment
         development are included in column 2 of Table 14-53.
Table 14-53 —Erosion and sediment control
                 column 1                                             column 2
             Specific Outcomes                       Probable solutions (if code assessablecode
                                                                    assessment)
14.124 Effects of works
Erosion and drainage control, sediment
capture and stormwater runoff                       S1.1 Construction works are designed,
O1 Development design, density, layout, and         planned and executed with respect to the
staging provide for erosion control, drainage       principles of erosion reduction, drainage
control and sediment capture and treatment          management and sediment capture in
during the construction phase.                      accordance with Appendix 2, Table A of the
                                                    Queensland State Planning Policy and
                                                    International Erosion Control Association Best
                                                    Practice Erosion and Sediment Control
                                                    (BPESC) 2008;


                                                  131
                                   Erosion and Sediment Control Code

Used in these records

About this file

File size
18.9 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)(PDF, 18MB).pdf · 18.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.