Division 18—Transport, Roads and Drainage Code
The Noosa Plan
14.140 Transport, Roads and Drainage Code
The provisions in this division comprise the Transport, Roads and Drainage Code. They
are—
compliance with the Transport, Roads and Drainage Code (section 14.142);
overall outcomes for the Transport, Roads and Drainage Code (section 14.143);
and
specific outcomes and probable solutions for the Transport, Roads and Drainage
Code (sections 14.144—14.151).
14.141 Compliance with the Transport, Roads and Drainage Code
Development that is consistent with the specific outcomes in Sections 14.144 to 14.151
complies with the Transport, Roads and Drainage Code.
14.142 Overall outcomes for the Transport, Roads and Drainage Code
14.142.1 The overall outcomes are the purpose of the Transport, Roads and Drainage Code.
14.142.2 The overall outcomes sought for the Transport, Roads and Drainage Code are the
following—
a) Development is consistent with the intentions of the strategic transport network, which is to--
i improve the coordination between transport and land use, to avoid excessive
motor vehicle travel;
minimise the environmental and social impacts of transport on the natural and urban
environment;
increase the use of walking, cycling, bus, train and ferry modes and minimise the use of the
private car;
ensure that vehicle access to the development does not compromise the capacity and
safety of the road system;
not increase the scale of the road network beyond that currently planned; and
ensure that development appropriately attenuates noise from adjoining roads.
b) Development works are designed and constructed to a standard that meets community
expectations, prevents unacceptable off-site impacts and optimises whole of life cycle costs;
c) Roads are designed and constructed to satisfy their specified functions and provide an
appropriate level of flood immunity (including local flooding on roads, i.e. through sufficient
kerb storage capacity);
d) Development provides appropriate buffering between noise sensitive uses and the major road
network and rail corridors;
e) Roads are designed and constructed to be compatible with the existing road network and
hierarchy and to provide a safe environment for vehicular traffic, pedestrians and cyclists;
f) Intersections and access points are designed and constructed to retain the low key
development style and slower pace enjoyed by residents and visitors;
g) Road and drainage infrastructure is constructed to a standard that minimises ongoing
maintenance costs;
150
Transport, Roads and Drainage Code
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)(PDF, 18MB)Related documentPublic source context ↗Public source context ↗Public source context ↗
2017-06-06-p-e-agenda-attachment-1-to-item-6-draft-alignment-amendments-part-1-pages-1-907-pdfRelated documentPublic source context ↗
About this file
- File size
- 18.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.