Skip to the record
Accept no imitations.

Council archive · source document

2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)

of 907

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (18.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.

                    column 1                                              column 2
                Specific Outcomes                                Probable solutions (if code




                                                                                                                      Including amendments to 3 July 2017
                                                                assessablecode assessment)




                                                                                                          The Noosa Plan
                                                          accordance with Healthy Waterways Water
                                                          By Design Guidelines;
                                                          AND

                                                          S1.3 Commitments are made to implement
                                                          a cost effective maintenance strategy for the
                                                          life cycle of any engineered water quality
                                                          treatment device;
                                                          AND

                                                          S1.4 Water quality nutrient load modelling is
                                                          undertaken in accordance with Water by
                                                          Design Music Modelling Guidelines to
                                                          demonstrate compliance with the SPP
                                                          nutrient reduction requirements;
                                                          AND

                                                          S1.5 Stormwater outlets that directly
                                                          discharge to naturally acidic environments
                                                          are managed to prevent eutrophication;
                                                          AND

                                                          S1.6 Suitable methods are incorporated to
                                                          prevent the spread of invasive
                                                          environmental weed species at stormwater
                                                          outlets.
Water demand
O2 Urban development reduces the need for                 S2.1 Captured water is plumbed to be
mains water by capturing and utilising run-off from       available for all external uses including
appropriate areas on site.                                gardening, irrigation, ponds and outdoor
                                                          cleaning.

O3 Urban development reduces the need for                 S3.1 Planting is in accordance with PSP 3
mains water by eliminating requirement for irrigation     Landscaping Plans and Guidelines.
via the use the endemic plant landscaping design.

O4 Backflow devices or similar systems are                S4.1 A suitable backflow prevention device
installed, where necessary, to ensure water reuse         is installed to protect the drinking water
facilities have no impact on the quality of the town      within the reticulated water supply in
mains water.                                              accordance with AS/NZS 3500:2003
                                                          Plumbing and Drainage.

Shire Business Centre
O5 Within the Shire Business Centre site, as              No probable solution
shown on Map SBC run-off treatment is contained
within the developable areas of the site and
drainage lines are only used for final polishing of
run-off;
AND

O6 Within the Shire Business Centre site, as
shown on Map SBC, on-site detention measures
are contained within the developable areas of the
site, clear of drainage lines and Open Space
Precincts.
Use of natural treatments and systems


                                                   163
                                       Water Sensitive Design Code

Used in these records

About this file

File size
18.9 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)(PDF, 18MB).pdf · 18.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.