Council archive · source document
2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)
Very large file (18.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.
column 1 column 2
Including amendments to 3 July 2017
Specific Outcomes Probable solutions (if code
The Noosa Plan
assessablecode assessment)
O7 Natural treatment strategies, including grass S7.1 No probable solution
swales and bio-retention systems, vegetated
filtration strips and gross pollutant traps, are used
wherever possible.
O8 Development design including density and S8.1 Integration of stormwater quality
scale provides adequate footprint to integrate all treatment is in accordance Healthy
elements of stormwater quality and quantity Waterways Water Sensitive Urban Design
treatment infrastructure including, where relevant, Guidelines for South East Queensland and
bio retention basin batters and maintenance the Water by Design Bio retention Technical
access, without the need for retaining walls. Design Guideline.
O9 Stormwater conveyance channels use natural S9.1 Landscape and ecological features
channel design principles to convey external (e.g. plant species and habitat types) used
catchment stormwater through the development in stormwater conveyance channels are
site and support landscape, passive recreation and complementary to the local context,
ecological values. including natural waterways;
AND
S9.2 Planting densities result in a stable
channel over the long term and minimize
potential for invasive weed growth.
O10 Development design and operation facilitates S10.1 Methods to prevent gross pollutants
nil increase in gross pollutants entering stormwater entering stormwater systems and waterways
systems. are adopted that—
a) are low maintenance;
b) prevent nutrient leaching in the event
scheduled maintenance is delayed;
and
c) facilitate human behaviour change
(e.g. signage, bins).
164
Water Sensitive Design Code
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)(PDF, 18MB)Related documentPublic source context ↗Public source context ↗Public source context ↗
2017-06-06-p-e-agenda-attachment-1-to-item-6-draft-alignment-amendments-part-1-pages-1-907-pdfRelated documentPublic source context ↗
About this file
- File size
- 18.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.