Council archive · source document
2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)
Very large file (18.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Including amendments to 28 October 2016
Division 21—Watercourses Works Code
The Noosa Plan
14.159 Watercourses Works Code
The provisions in this division comprise the Watercourses Works Code. They are—
compliance with the Watercourses Works Code (section 14.167);
overall outcomes for the Watercourse Works Code (section 14.168);
specific outcomes and probable solutions for the Watercourse Works Code (sections
14.169—14.178).
14.160 Compliance with the Watercourse Works Code
Development that is consistent with the specific outcomes in section 14.169—14.178
complies with the Watercourse Works Code.
14.161 Overall outcomes for the Watercourse Works Code
14.161.1 The overall outcomes are the purpose of the Watercourse Works Code.
14.161.2 The overall outcomes sought for the Watercourse Works Code are to ensure that
operational work within Noosa Waters and prescribed tidal work—
a) is compatible with the character and amenity of its surrounding area;
b) is design and constructed in a way to ensure it is structurally sound;
c) is safe for use; and
d) does not adversely affect—
i existing public access to any foreshore areas or tidal waters;
safety and navigation of any watercourses;
natural values of watercourses, including water quality and bed and bank habitat; and
the structural integrity, operation or maintenance of any existing structure.
14.162 Specific outcomes, probable solutions and acceptable solutions for
the Watercourses Works Code
The specific outcomes sought for the Watercourse Works Code are included in column 1
of Table 14-64 to Table 14-65. Probable solutions for code assessablecode assessment
development are included in column 2 of Table 14-64 to Table 14-65.
Table 14-64 Prescribed Tidal Works (waters outside Noosa Waters canal)
column 1 column 2
Specific Outcomes Probable solutions (if code assessablecode
assessment)
14.163 Siting
O1 The construction of new jetties, wharves No solution provided.
and boardwalks on freehold land in largely
undeveloped sections of a watercourse is
avoided.
O2 The construction of new jetties and
wharves on public lands is avoided unless there
is a clear demonstrated public benefit and public
support.
162
Watercourses Works Code
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)(PDF, 18MB)Related documentPublic source context ↗Public source context ↗Public source context ↗
2017-06-06-p-e-agenda-attachment-1-to-item-6-draft-alignment-amendments-part-1-pages-1-907-pdfRelated documentPublic source context ↗
About this file
- File size
- 18.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.