Council archive · source document
2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)
Very large file (18.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.
column 1 column 2
Specific Outcomes Probable solutions (if code assessablecode
Including amendments to 3 July 2017
assessment)
The Noosa Plan
O3 Prescribed tidal works are not located on
Figure 14-28–Noosa Heads Lions Park to
the southern bank of the Noosa River and
Weyba Bridge
tributaries between the Noosa Heads Lions
Park and Weyba Bridge (Refer Figure 14-28).
O4 Prescribed tidal work does not include
extensions of on-site recreational areas unless
there is a clear demonstrated public benefit and
public support.
ENUE
SIA AV
BANK
E
RIV
AD
OS
NO
14.164 Character and Amenity
O5 Prescribed tidal works are designed and S5.1 For lots with frontages greater than 15m or
sited to ensure— greater in width, jetties and pontoons are setback
a) they are contained within the prolongation of a minimum of 3m from the prolongation of the
boundaries of the lot; boundaries, except as allowed for in S5.2 and
b) that when a vessel is berthed it does not S5.3; (Refer Figure 14-29);
encroach over the prolongation of
boundaries of the lot; Figure 14-29
c) a high level of visual amenity is maintained
when viewed from the watercourse and
adjoining lands;
d) they avoid conflicts with uses in the water
and on the foreshore and adjoining lands;
e) cluttering of watercourses is avoided;
f) excessive traffic volumes within foreshore
areas and adjoining lands are avoided;
g) materials blend with the natural surrounds;
and
h) they reflect the character and setting of the
immediate surrounds or the locality.
OR
S5.2 For lots less than 15m in width (including
lots located in canal bends or on lots located in
the head of the canal)—
a) a joint application is made with the
adjoining owner; or
b) where a joint application is not possible,
jetties and pontoons—
i) are setback a minimum of 1m from the
prolongation of the boundaries;
ii) are not more than 1.2m in width; and
iii) have no head and are located such
163
Watercourses Works Code
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)(PDF, 18MB)Related documentPublic source context ↗Public source context ↗Public source context ↗
2017-06-06-p-e-agenda-attachment-1-to-item-6-draft-alignment-amendments-part-1-pages-1-907-pdfRelated documentPublic source context ↗
About this file
- File size
- 18.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.