Council archive · source document
2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)
Very large file (18.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Including amendments to 28 October 2016
column 1 column 2
The Noosa Plan
Specific Outcomes Probable solutions (if code assessablecode
assessment)
O16 The design and provision of public S16.1 For lots in urban settlements—power
services and utilities, including sewerage, water, supply and communications infrastructure are
electricity, street lighting and telecommunication provided underground;
services— OR
a) meets the needs of users; S16.2 For lots elsewhere—power supply and
b) ensures health, safety and convenience of communications infrastructure are provided
the community; underground unless—
c) protects the natural environmental values
of the site and surrounds, including visual a) located in the Rural Zone or Rural
amenity and native vegetation; Settlement Zone and where not in a
d) are cost effective over their life cycle; Bushfire Hazard Area as defined on
e) minimises adverse impacts to the Overlay Maps OM1.4-OM9.4;
environment (including the amenity of the b) new low voltage lines can be strung from
local area) in the short and long term; and poles carrying existing high voltage lines;
f) ensures that the existing systems are or
upgraded or relocated to be capable of c) no extensions to the existing reticulation
supporting the proposed development; network is necessary; or
d) it is necessary to cross a body of water;
AND
S16.3 Street lighting is provided in accordance
with Section 3.19 of PSP5 Engineering Design
Standards – Roads, Drainage and Earthworks;
AND
S16.4 For lots not within a sewerage service
area—the lot has sufficient area and other
attributes to ensure sustainable on-site sewerage
39
disposal ;
Editor’s note:
PSP24 – Effluent Disposal details requirements for the
design and siting of effluent disposal systems where
located outside a sewerage service area. Compliance
with PSP24 will be considered as part of Council’s
assessment of the plumbing and drainage application.
Advisory note
PSP24 – Effluent Disposal details
requirements for the design and siting of
effluent disposal systems where located
O17 Essential network infrastructure (e.g. outside a sewerage service area. Compliance
electricity, water supply, sewerage and with PSP24 will be considered as part of
telecommunications) maintains effective Council’s assessment of the plumbing and
function during and immediately after flood drainage application.
events.
39
PSP1 details information Council may request including an effluent disposal report.
182
Reconfiguring a Lot Code
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)(PDF, 18MB)Related documentPublic source context ↗Public source context ↗Public source context ↗
2017-06-06-p-e-agenda-attachment-1-to-item-6-draft-alignment-amendments-part-1-pages-1-907-pdfRelated documentPublic source context ↗
About this file
- File size
- 18.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.