Skip to the record
NoosaWatch™: The source of truth.

Council archive · source document

2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)

of 907

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (18.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.

                      column 1                                                   column 2




                                                                                                                                 Including amendments to 3 July 2017
                Specific Outcomes                           Probable solutions (if code assessablecode




                                                                                                                     The Noosa Plan
                                                                           assessment)
                                                           S17.1 Components of the essential network
                                                           infrastructure that are likely to fail or may result in
                                                           contamination when inundated by flood water—
                                                           a)   comply with Table 13.12; or
                                                           b)   are designed and constructed to exclude
                                                                water inundation or infiltration and resist
                                                                hydrostatic and hydrodynamic forces as a
                                                                result of inundation.
Electricity supply infrastructure
O18 Uses and works maintain a safe distance                S18.1 Building footprints are situated clear of
from electrical infrastructure including                   any power easements on-site;
substations, overhead power lines, power poles
and transformers.                                          AND
                                                           S18.2 Building footprints are not less than 50m
                                                           from an existing fenced electricity substation.

14.190 Earthworks and stormwater management40
O19 Stormwater run-off is managed so as not                No solution provided
to cause any adverse impacts on the built or
natural environment including changes in
quality, quantity or location of stormwater
discharges.

O20 Filling or excavation only occurs where it             No prescribed solution.
does not adversely impact on—
a)    watercourses, drainage lines and
      wetlands; or
b)    vegetation on land identified on
      Biodiversity Overlay Maps OM1.1-OM9.1;
      or
c)    water levels on properties elsewhere.


14.191 Landscaping and visual amenity
O21 Land development responds to the                       S21.1 The natural landform and landscape are
distinctive landscape character of the site by             not modified to accommodate the development.
utilising the natural features of the site, which
include—
a) watercourses and drainage lines;
b) significant trees;
c) understorey vegetation;
d) rock outcrops; and
e) views.
O22 Native vegetation, including individual                S22.1 Buffers of existing native vegetation
mature trees are retained, protected, maintained           around site boundaries and environmentally
40
 PSP1 identifies information that may be requested by Council including Stormwater Management Plans and Stormwater
Master Plans,




                                                       183
                                             Reconfiguring a Lot Code

Used in these records

About this file

File size
18.9 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)(PDF, 18MB).pdf · 18.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.