Sewer Infrastructure
41. The internal sewerage reticulation system, including pump stations shall be constructed to the
Standards and Requirements as detailed in the Plumbing and Drainage Act 2002.
42. The internal sewerage reticulation system shall be designated as “private sewers” with all
operations and maintenance requirements the responsibility of the property owner/body
corporate.
43. Sewer house connection drains shall be located within the disturbance area for the driveway if
practicable.
44. Occupation of the “retreat” buildings and/or any other building shall not commence until such
time as the sewerage system is fully operational and connected to a permanent sewerage
treatment facility and disposal area as approved by the EPA.
Water Supply
45. Water supply infrastructure for the development shall be designed to ensure consistency with
OO8c), OO15, Section 6.4 and Schedule F – 9.6.10 of the NNSETP Code.
Roadworks Contributions (Local Road Network)
46. A roadworks contribution of $14,811 towards the upgrading of Moorindil Street shall be paid to
the Council prior to the commencement of the use of Stage Two. This amount will be subject
to variations in the Consumer Price Index, All Groups Brisbane from September 2007 until the
date of payment. The money will be used to assist Council with the cost of roundabout
improvements along Moorindil Street.
Erosion and Sediment Control
47. Any person acting on this permit shall prevent erosion and sediment export from leaving the
site. Site control measures such as silt fencing, controlled gravel access to the site and
controlled disposal of waste, will be necessary.
In this regard plans detailing the methods of controlling erosion and sediment are required to
be submitted to the Council for approval prior to obtaining a Development Permit for
Operational Works.
Management Plans
48. The applicant shall submit reports for the relevant stage in accordance with the Environmental
Management Strategy as outlined in Section 6 of the NNSETP Code, unless previously
approved by Council for all stages. These reports shall be submitted for approval in
conjunction with Operational Works application for the relevant stage.
49. A Construction Management Plan addressing all construction phases of the relevant stage
shall be prepared by a suitably qualified person and submitted to Council for approval prior to
obtaining a Development Permit for Operational Works. The plan should aim to address every
foreseeable problem eg: movements of excavation and construction machinery, building
material deliveries, stockpiling of materials etc that is likely to occur during the construction
process of the relevant stage and include recommendations on how these can be overcome or
minimised.
General
50. Digital detailed designs including drawings, calculations, etc shall be submitted with any
application for a Development Permit for Operational Works in respect of roadworks and
stormwater drainage works. The design shall be in accordance with Council’s Planning
Scheme Policy PSP05 – Engineering Design Standards – Roads, Drainage and Earthworks.
To avoid conflict with underground pipes or services, all existing and proposed services
required by the development shall be shown on the plans.
51. Any damage caused to any public utility during the course of construction shall be repaired to
Council’s standards and at no cost to Council.
Page 6 of 18
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/742 SUPERSEDED Change to a Development Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 301 KB (small file)
- File type
No other editions are linked here.