3 Provide a wholistic stormwater management plan for the new buildings and
carparking areas. The plan must be prepared by a suitably qualified person
and demonstrate compliance with Noosa Plan 2020 – Water Quality and
Drainage Code for both quantity and quality.
4 Provide an amended plan that provides the necessary turning areas or
alternatively demonstrate how the proposed carparking layout complies with
AS/NZS2890.1:2004 section 2.4.2(c)).
Council’s Sport, Strategy and Projects Advisor includes an addendum letter including the
forthcoming projects at the Noosa District Sports Complex including:
- New connection road; and
- Master drainage plan.
To coordinate future capital works, funding and timing – appropriate conditions are to be
imposed for the development to be carried out in accordance with a site based storm water
management plan, as well as the design of the stage two internal road and car park
upgrades. All the works are included within the endorsed Noosa District Sports Complex
Master Plan.
----------------------------------------------------------------------------------------------------------------------
Pursuant to the Development Assessment Rules, the applicant has given the assessment
manager the information requested. Please continue with the assessment of the
application at your earliest convenience.
If you have any further queries in relation to the above, please do not hesitate to contact
myself.
Regards,
Jack Lewis B.Sc Hons UNSW M.Plan Otago
Planner/Director
Pivotal Perspective Pty Ltd
0406 334 227
Page 2 of 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original