2015-10-13 Infrastructure & Services Committee Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
Page 23 of 25
RISKS or
1. Culvert failures Asset condition
2. Assets within sensitive environments. The level of confidence in stormwater asset
3. Stormwater pipe failures causing flooding condition is deemed to be very low. The current
to property. asset conditions utilised in this plan are determined
4. A lack of condition knowledge across the on an “aged based” calculation and therefore do not
network contributing to _ ill-informed reflect their true physical condition.
decisions. This approach does not take into account assets
5. Stormwater infrastructure in road carriage that are impacted by their environmental conditions
ways. such as active soils, marine locations, or are
structures within road carriage ways or have poor
construction techniques. Therefore a more detailed
physical condition assessment is required before
= renewal investment can be considered.
S s,s
2 Age Based Condition Physical condition assessments have commenced
s P fil through the annual CCTV inspection programme.
$s rome These inspections make the use of advanced
3% technology by utilising a combination of robotic
£100,000 equipment, video imagery and software systems to
¢ provide high level detail on the condition of any
@ 50,000 il given stormwater asset inspected. These
o 0 Gi inspections not only record maintenance defects
but also asset condition supported by photo and
d. 2 3 4 5 video imagery.
Condition Rating
EES
[EEG YER tern eed eer
1 Very Good Condition ;
Asset renewal Only normal mainetnance required
aes Oa 2 Minor Defects Only
Although the existing renewal activities are a Minor maintenance required (5%)
result of asset failure and defect detection, the Maintenance Required To Return to Accepted
development of a renewal programme will improve 3 _ Level of Service oa cae
the capability of predicting intervention a aia )
3 4 ‘equires ‘enewal
timeframes. Significant renewal/upgrade required (20-40%)
Stormwater renewals are one of the first asset 5 Asset Unserviceable
classes outside of roads that have a funded Over 50% of Asset requires replacement :
annual renewal program for pipes, pits, kerb and
channels. In addition to these renewals an annual The Physical Asset Condition is measured using the “core asset
ot ee, 5 a management approach” based on a 1 - 5 scale from the IIMM,
proactive CCTV inspection has commenced to Intemational Edition 2011. This is a universal approach being
further develop and prioritise asset renewal. used for the majority of Council's infrastructure until more
advanced asset management practices are considered.
Improvement Plan
1. Continue with cyclical maintenance inspections and CCTV condition assessments across stormwater
infrastructure with results and overall asset condition (based on the core asset management approach)
recorded in the asset system;
2. Reconcile financial asset data, GIS data and Inspection data to ensure a single point of truth for asset data
within the asset system;
3. Develop a long term asset replacement programme integrated with financial planning and asset
deterioration modelling;
4. Produce ‘next generation’ Asset Management Plans at a lower level of asset class hierarchy, for example
specific to pipe network, kerb and channel, bio-basins
NOOSA COUNCIL PO Box 141 P. (07) 5329 6500 [email protected]
r Set iD: 199678: TEWANTIN QLD 4565 F. (07) 5329 6501 www.noosa.qld.gov.au
Page 23 of 25See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.