nee ee re '
‘ ey 2 = a ee a “i a, ==! “Perel
a) = V4 = ee ea. » pgs?
75 5
*. an
Overview ial
Environmental compliance is a major risk with ,
waste assets. A lack of knowledge in the “a
condition of an asset, resulting in inadequate
renewal/rehabilitation or poor construction Ps
techniques can contribute to a higher risk = -
outcome.
Current confidence in the knowledge of the o
condition of waste assets is deemed to be low. x
The development of a cyclical condition
inspection program is therefore required.
Total number of waste assets = 23 Age profile
Current replacement cost = $9.6 Waste assets are recent assets in the scale of the
Current written down value = $7.1m Overall asset base. The current age profile has
2014/15 depreciation of $444k identified that the assets are less than 12 years
2014/15 maintenance = $ 50k old. However, waste facility sites are dynamic as
2015/16 capital renewal program $ 200k » they evolve.to complement the landfilling activities
Critical assets — Noosa Eumungie@ead Landfill across the entire site and therefore waste assets
are not constructed to have long lives.
: The current age profile in the graph below
This first generation asset management plan highlights the significant investment in waste
provides an initial snapshot of Council’s waste BsSele a recent yours. This Incides the
assets and infrastructure. Through this plan, major PRPSNSION of the current waste disposal landfill
risks and priorities will be identified through the cell and capital improvements to the leachate
improvement asset management. In the future, the collection system. As these assets are in the early
development of next generation asset stages of their useful lives it is important to
management plans will provide far greater detail continue to monitor and assess their condition and
where required, undertake the recommended
The waste assets consist of assets associated with maintenance activities te ensure these assets
the operation of waste disposal activities including reach their full life potential.
landfill, carparks, buildings, leachate systems and
stormwater management systems.
3 ‘
>. Asset Age Profile
28
ao
2 45,000
a 2,000 i |
= 4,000
=
Oo
0 = = o —_.
2004 2007 2009 2010 2011 2012 2013
Document SéttD: 19961829
Version: 5, Version Date: 01/10/2015
Page 24 of 25See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.