INFRASTRUCTURE & SERVICES COMMITTEE MEETING AGENDA 13 OCTOBER 2015
2 ADOPTION OF ASSET MANAGEMENT PLANS
DOCUMENT INFORM AT ION
Author Infrastructure Planning & Design Manager, Nicholas Wellwood
Asset Planning Coordinator, Bryan O’Connor
Planning & Infrastructure Department
Index ECM/Subject/Asset Management
Attachments 1. Asset Management Plans
EXECUTIVE SUMMARY
Not applicable.
RECOMMENDATION
That Council note the report by the Infrastructure Planning & Design Manager and the Asset
Planning Coordinator to the Infrastructure & Services Committee Meeting dated 13 October 2015
and adopt the following Asset Management Plans:
A. Bridges Asset Management Plan;
B. Building & Facilities Asset Management Plan;
C. Foreshore Asset Management Plan;
D. Parks, Playgrounds & Reserves Asset Management Plan;
E. Pathways & Boardwalks Asset Management Plan;
F. Roads & Carparks Asset Management Plan;
G. Stormwater Asset Management Plan; and
H. Waste Infrastructure Asset Management Plan.
REPORT
The development of Asset Management Plans is one of the fundamental building blocks of good
asset management practice. These plans have been developed to align with Council’s Corporate
Plan Strategic Goal of Looking after community assets and are a key focus area of the Corporate
Plan.
1. Executive overview
The following table provides a snapshot of Council’s major asset classes.
Asset class Current Level of Confidence description
replacement confidence in 1 – very high level of confidence
2 – high level of confidence
cost asset condition
3 – moderate level of confidence
data 4 – low level of confidence
5 – very low level of confidence
Roads & Carparks $427.6m 3 moderate
Stormwater $149.5m 5 very low
Bridges $107.5m 3 moderate
Buildings & Facilities $74.6m 5 very low
Pathways & Boardwalks $44.4m 3-4 low to moderate
Parks, Playgrounds & Reserves $28.4m 3-4 low to moderate
Foreshore $12.5m 3 moderate
TOTAL $844.5m
Page 8 of 25
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.