Skip to the record
Every meeting, every word.

Original source · versioned page text

2016 08 09 - S&O Agenda - Item 8, Att 2 - AEC Noosa Convention & Performing Arts Centre Pre-feasibility Review

of 48

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PRE-FEASIBILITY OF CONVENTION AND PERFORMING ARTS CENTRES


Table 7.6. Construction Phase Impacts
    Impact                Output ($M)         GVA ($M)       Income ($M)      Employment
                                                                                    (FTE)
    Direct Impact                 $15.0            $4.6              $2.4              28
    Indirect Impact               $10.0            $4.6              $2.7              32
    Total Impact                  $25.0            $9.2              $5.1              60
Note: Totals may not sum due to rounding.
Source: AEC


7.3.2         Operations

7.3.2.1       Convention Centre

Once fully operational the Convention Centre development is expected to support the following economic activity
through operations and additional visitor spend within the Noosa LGA annually:

      $7.9 million in additional output (including $5.4 million directly).

      $3.6 million in GVA (including $2.3 million directly).

      $2.3 million in incomes and salaries paid to households (including $1.6 million directly).

      39 FTE jobs (including 30 directly).

The breakdown of modelling outcomes is provided in the table below.

Table 7.7. Operational Phase Impacts
    Impact                Output ($M)         GVA ($M)       Income ($M)      Employment
                                                                                    (FTE)
    Direct Impact                  $5.4            $2.3              $1.6              30
    Indirect Impact                $2.5            $1.2              $0.7               9
    Total Impact                   $7.9            $3.6              $2.3              39
Note: Totals may not sum due to rounding.
Source: AEC


7.3.2.2       Performing Arts Centre

Once fully operational the PAC development is expected to support the following economic activity through
operations and additional visitor spend within the Noosa LGA annually:

      $2.0 million in additional output (including $1.3 million directly).

      $0.9 million in GVA (including $0.6 million directly).

      $0.7 million in incomes and salaries paid to households (including $0.5 million directly).

      14 FTE jobs (including 11 directly).

The breakdown of modelling outcomes is provided in the table below.

Table 7.8. Operational Phase Impacts
    Impact                Output ($M)         GVA ($M)       Income ($M)      Employment
                                                                                    (FTE)
    Direct Impact                  $1.3            $0.6              $0.5             11
    Indirect Impact                $0.7            $0.4              $0.2              3
    Total Impact                   $2.0            $0.9              $0.7             14
Note: Totals may not sum due to rounding.
Source: AEC




                                                                                                            32
Log in to download the original file

2016 08 09 - S&O Agenda - Item 8, Att 2 - AEC Noosa Convention & Performing Arts Centre Pre-feasibility Review(PDF, 2MB).pdf · 1.8 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.