Project No. 1-22543                                                                                                          Page | 15
June, 2020
Ref: 1-22543, 2020-05-20, BR SSA VER 1
Sanya Holdings – Slope Stability Assessment and Geotechnical Report - Proposed Residence, 40 Park Crescent, Sunshine Beach




from the dwelling) and properly engineered retaining walls. Such treatment options should be
clearly stated as part of the risk management requirements.

    5.3 Site Specific Recommendations

           5.3.1       General

The site risk assessment has assumed that several measures were in place including properly
designed and constructed retaining walls (where applicable), site drainage and scour protection.

           5.3.2       Scour

It is essential that any permanent batters/slopes that result from the development (e.g. adjacent
to existing easements etc.) are suitably protected from erosion and scour by appropriate
drainage and the establishment of ground cover and shrubs, etc. Runoff should not be allowed
to discharge directly across the batters without suitable scour protection.

Top soiling and seeding or hydromulching on any cut areas steeper than 1:5 (11 degrees) is
suggested so that protection could be provided until such time as the grass cover is
established. The type of protection may also need to be discussed with the local council given
the adjacent dune environment.

           5.3.3       Retaining Structures

At this stage, we understand that retaining structures will be utilised for several parts of the
proposed development. It is assumed and expected that any walls (regardless of type) would
be designed and constructed to meet relevant retaining wall codes and good engineering
practice as well as the recommendations from this report for this site.

           5.3.4       Continued Maintenance

As with all developments, continued maintenance of the proposed site works is essential to
maintain the assessed risks outlined in this report.

Maintenance should include but not be limited to the following:-

          Maintaining clear drainage paths for surface water flows.
          Maintaining and promoting revegetation of exposed batter areas.
          Regular maintenance checks to ensure any damage is repaired in a timely manner.




                                                                                                               SOIL SURVEYS

Used in these records

About this file

File size
7.2 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

RFI - Attachment C - Slope Stability Assessment and Geotechnical report.pdf · 7.2 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.