Council archive · source document
RFI - Attachment C - Slope Stability Assessment and Geotechnical report · MCU20/0026
Project No. 1-22543 Page | 16 June, 2020 Ref: 1-22543, 2020-05-20, BR SSA VER 1 Sanya Holdings – Slope Stability Assessment and Geotechnical Report - Proposed Residence, 40 Park Crescent, Sunshine Beach 6.0 ENGINEERING ASSESSMENT 6.1 Civil Works 6.1.1 Trafficability and Site Preparation The fieldwork for this investigation was carried out by a ute mounted drilling rig (at street level) and hand equipment (due to the steep slope which limited access onto the site for our machinery). It should be noted that some problems may be anticipated during wet weather for even light weight 4WD vehicles. The soils on site are sensitive to repetitive vehicle loading and water (i.e. they will lose strength through repetitive vehicle loading or if they become overly moist or wet). Further, seepage may also result in a subsequent loss of strength. This may limit trafficability and create difficulties for earthworks operations. This situation would be more pronounced if rainfall followed initial clearing, stripping and grubbing. It is recommended that after stripping, clearing and grubbing, the exposed surface in the construction area be proof rolled (where appropriate) to assist in identifying weak areas and to improve trafficability. Maintaining adequate drainage conditions is essential. It should be ensured that runoff is diverted away from the construction area to prevent ponding of water. Potential trafficability problems with this site should not be underestimated. The site will very quickly become untrafficable if appropriate seepage and drainage control measures, along with construction practices appropriate for site conditions, are not maintained. The contractor should fully inform himself of the ground conditions on site prior to commencement of earthworks. This requirement should be explicit in any earthworks specifications or contract. Working Platforms For Tracked Plant and Heavy Construction Vehicles The scope of Soil Surveys Engineering’s study DOES NOT include the design of a working platform for heavy construction vehicles or heavy tracked plant on or around the site. Detailed design of a working platform should be carried out considering the operation of actual machinery proposed to be used. This is particularly important when considering the use of heavy piling rigs and heavy cranes - the piling/crane contractor should be consulted regarding their requirements. 6.1.2 Earthworks It is envisaged that the basement platform will be created with maximum cuts of up to approx. 4.0m to 5.0m with possible backfilling of up to approx. 2.5m required behind permanent retaining structures. Earthwork procedures should be carried out in a responsible manner in accordance with AS 3798-2007 'Guidelines on Earthworks for Commercial and Residential Developments'. It is recommended that the earthworks contractor make themselves familiar with site conditions. SOIL SURVEYS
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
RFI - Attachment C - Slope Stability Assessment and Geotechnical report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 7.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.