RFI - engineering response plans

of 13

Page text shows just the words. Original shows the document exactly as it was published.

Original PDF page 1, section 1. The text section number identifies this passage in the reader.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
RESIDENTIAL DUPLEX DEVELOPMENT
6 WYANDRA STREET, NOOSA HEADS, QLD 4567
Lot 40 RP 139776
CIVIL WORKS
GENERAL NOTES:
THE FOLLOWING INSPECTIONS MUST BE COMPLETED BY RECOR ENGINEERS BEFORE                            9.    CONTRACTOR TO UNDERTAKE ALL WORKS IN ACCORDANCE WITH ALL WORKPLACE
ENGINEERING CERTIFICATION WILL BE ISSUED. THE CONTRACTOR IS TO PROVIDE A MINIMUM                       HEALTH AND SAFETY REQUIREMENTS.
OF 72 HOURS NOTICE TO RECOR FOR REQUIRED INSPECTIONS. SHOULD THE CONTRACTOR FAIL                 10.   WHERE ANY EXCAVATION OR CONSTRUCTION WORKS ARE TO BE IN CLOSE PROXIMITY TO
TO REQUEST AN INSPECTION, THE CONTRACTOR WILL BE RESPONSIBLE FOR ALL COSTS TO                          NEIGHBOURING LOT BOUNDARIES OR INFRASTRUCTURE, CONTRACTOR TO ALLOW IN
ALLOW FOR THE WORKS TO BE INSPECTED TO THE SATISFACTION OF RECOR. ANY                                  SCOPE OF WORKS TO PROVIDE ALL MEASURES NECESSARY TO ENSURE THE INTEGRITY
INSPECTIONS THAT FAIL ARE TO BE RE-INSPECTED WITH ALL REINSPECTION COSTS TO BE PAID                    OF EXISTING BOUNDARIES AND INFRASTRUCTURE. THIS MAY INCLUDE THE USE OF LOW
BY THE CONTRACTOR.                                                                                     VIBRATION EQUIPMENT, TRENCH SHORING ETC AS REQUIRED.
a.      PRESTART                                                                                 11. PRIOR TO THE CONTRACTOR COMMENCING ANY WORKS DETAILED ON THESE DRAWINGS,
b.      EARTHWORKS - FINAL STRIPPING OF TOPSOIL, INSTALLATION OF SEDIMENT AND EROSION                THE CONTRACTOR IS TO NOTIFY RECOR AND RECEIVE WRITTEN CONFIRMATION THAT
        CONTROL MEASURES UNSUITABLE GROUND                                                           WORKS CAN COMMENCE.
c.      SIDE AND CUT OFF DRAINS                                                                  12.   CONTRACTOR TO PROVIDE AS CONSTRUCTED DRAWINGS FOR ALL CONSTRUCTED WORKS
                                                                                                       IN ACCORDANCE WITH LOCAL GOVERNMENT REQUIREMENTS. UNLESS OTHERWISE
d.      STORMWATER PIPE LAID ON BEDDING PRIOR TO BACKFILL                                              ADVISED BY RECOR CONTRACTOR TO NOTE COUNCILS ADAC REQUIREMENTS.
e.      STORMWATER TRENCH BACKFILLED PRIOR TO PAVEMENT PLACEMENT                                 13.   CONTRACTOR TO UNDERTAKE ALL WORKS IN ACCORDANCE WITH RELEVANT APPROVALS.
f.      STORMWATER STRUCTURE BASE SLABS                                                          14.   CONTRACTOR TO ALLOW TO LIASE/CO-ORDINATE WITH ELECTRICAL, LANDSCAPE AND
g.      SEWER RETICULATION                                                                             OTHER SERVICE CONTRACTORS THROUGHOUT CIVIL CONSTRUCTION.

h.      WATER RETICULATION                                                                       15.   CONTRACTOR TO ORGANISE ALL DEMOLITION PERMITS PRIOR DEMOLITION WORKS
                                                                                                       COMMENCING ON SITE.
i.      PAVEMENT SUBGRADE
                                                                                                 16.   CONTRACTOR TO ALLOW TO DEMOLISH ALL EXISTING STRUCTURES, ROADS AND
j.      PAVEMENT REINFORCING                                                                           SERVICES WITHIN LIMIT OF WORKS AND REMOVE FROM SITE U.N.O.
k.      PAVEMENT PRIOR TO SEALING (PRESEAL)                                                      17.   CONTRACTOR TO UNDERTAKE DILAPIDATION REPORT FOR ADJOINING PROPERTIES AND
l.      RETAINING WALL FOOTING REINFORCING                                                             COUNCIL ROADS AND VERGES PRIOR TO COMMENCEMENT OF ANY WORKS ON SITE.

m.      RETAINING WALL BLOCKWORK PRIOR TO CORE FILL                                              18.   CONTRACTOR TO CLEAR AND GRUB ALL VEGETATION ON SITE AS IDENTIFIED IN THE
                                                                                                       APPROVED VEGETATION MANAGEMENT PLAN. CONTRACTOR TO ENSURE ALL TREE ROOTS
n.      STEEL REINFORCEMENT OF CONCRETE STRUCTURES                                                     AND STUMPS ARE COMPLETELY REMOVED AND BACKFILLED TO LEVEL 1 SUPERVISION.
o.      PRACTICAL COMPLETION                                                                           CONTRACTOR TO ALLOW TO MULCH ALL CLEARED VEGETATION AND STOCKPILE ON SITE
                                                                                                       OR REMOVE FROM SITE AS DIRECTED.
p.      ON MAINTENANCE
                                                                                                 19. DRAWINGS TO BE READ IN CONJUNCTION WITH OTHER PROJECT
q.      OFF MAINTENANCE                                                                              CONSULTANTS/CONTRACTORS DRAWINGS.
r.      ANY OTHER INSPECTION AS SPECIFIED BY LOCAL COUNCIL (REFER DEVELOPMENT                    20. CONTRACTOR TO PREPARE AND HAVE APPROVED BY RELEVANT AUTHORITY: ROAD
        APPROVAL)                                                                                    OPENING PERMIT AND TRAFFIC MANAGEMENT PLAN FOR ALL WORKS WITHIN COUNCIL
s.      ANY OTHER INSPECTION AS REQUIRED BY UNITY WATER AND WHERE RELEVANT TO THEIR                  ROAD RESERVES. CONTRACTOR TO ALLOW FOR ALL COSTS ASSOCIATED WITH
        CERTIFICATION SCHEME                                                                         IMPLEMENTATION OF THE TMP.                                                                                                                    LOCALITY PLAN
                                                                                                 21. ALL WORKS TO BE COMPLETED IN ACCORDANCE WITH ALL LOCAL AUTHORITY APPROVALS                                                                    NOT TO SCALE
                                                                                                     RECEIVED FOR THE PROJECT
GENERAL NOTES
                                                                                                 22. CONTRACTOR TO UNDERTAKE ALL WORKS IN ACCORDANCE WITH OPW APPROVALS BY
1.      ALL DIMENSIONS SHOWN ARE IN METERS UNLESS OTHERWISE SHOWN.                                   COUNCIL.
2.      ALL SETOUT ON SITE IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR. CONTRACTOR              23. NO WORKS ARE TO BE UNDERTAKEN ON LAND OUTSIDE OF THE SITE BOUNDARY WITHOUT
        TO ALLOW FOR ALL MEANS NECESSARY TO ACCURATELY SETOUT THE WORKS.                             FORMAL APPROVAL BY THE OWNER/CUSTODIAN OF THAT LAND INCLUDING BUT NOT
3.      ALL WORKS TO BE CONSTRUCTED IN ACCORDANCE WITH PROJECT SPECIFICATIONS AND                    LIMITED TO PRIVATE PROPERTY, ROAD RESERVE, PARKS/OPENSPACE, EASEMENTS.
        WHERE FURTHER DETAILS ARE REQUIRED THE CONTRACTOR SHALL REFER TO NOOSA                   24. THE CONTRACTOR SHALL HAVE AN APPROVED SET OF CONSTRUCTION DRAWINGS AND
        SHIRE COUNCIL DEVELOPMENT GUIDELINES, LOCAL WATER AUTHORITY GUIDELINES,                      APPROVALS ON SITE AT ALL TIMES.
        ASSOCIATED STANDARD DRAWINGS AND SPECIFICATIONS U.N.O.
                                                                                                 25. ALL WATER AND SEWER RETICULATION WORKS TO BE CONSTRUCTED IN ACCORDANCE
4.      SHOULD ANY OF THE CONSTRUCTED WORKS BE CONSTRUCTED OUTSIDE OF THE                            WITH THE SEQ WATER SUPPLY AND SEWERAGE DESIGN AND CONSTRUCTION CODE (2013).
        TOLERANCES SPECIFIED WITHIN THE PROJECT SPECIFICATION AND LOCAL AUTHORITY
        REQUIREMENTS, THE CONTRACTOR WILL RECTIFY AT THEIR COST INCLUSIVE OF ANY
                                                                                                                                                                                                                                        DRAWING SCHEDULE
        ADDITIONAL COSTS INCURRED BY RECOR.                                                                                                                                                                         DRAWING NUMBER                                         DRAWING TITLE
5.      EXISTING SERVICES HAVE BEEN PLOTTED FROM SUPPLIED DATA AND AS SUCH THEIR                                                                                                                                          C01                                     COVER SHEET AND LOCALITY PLAN
        ACCURACY CANNOT BE GUARANTEED. NO RESPONSIBILITY IS TAKEN BY RECOR OR THE
        PRINCIPAL FOR THE ACCURACY AND COMPLETENESS OF THIS INFORMATION. IT IS THE                                                                                                                                        C02                                       EXISTING SITE SERVICES PLAN
        RESPONSIBILITY OF THE CONTRACTOR TO ACCURATELY ESTABLISH THE LOCATION AND
        LEVEL OF ALL EXISTING SERVICES PRIOR THE COMMENCEMENT OF ANY WORKS. ANY                                                                                                                                           C10                                    EROSION & SEDIMENT CONTROL PLAN
        DISCREPANCIES SHALL BE REPORTED TO THE SUPERINTENDENT. CONTRACTOR TO
        LOCATE AND PROTECT SERVICES AS REQUIRED DURING PROPOSED WORKS.                                                                                                                                                    C11                                   EROSION & SEDIMENT CONTROL DETAILS
6.      THE CONTRACTOR IS TO CHECK THROUGH LOCATING, POTHOLING AND SURVEY ALL                                                                                                                                             C20                                         BULK EARTHWORKS PLAN
        CRITICAL CONNECTION POINTS FOR ALL CIVIL WORKS SHOWN ON THE DRAWINGS
        INCLUDING ANY POTENTIAL EXISTING SERVICES CLASHES PRIOR TO COMMENCEMENT OF                                                                                                                                        C21                                       BULK EARTHWORK SECTIONS
        CIVIL WORKS. CONTRACTOR TO IMMEDIATELY REPORT ANY DISCREPANCIES TO RECOR
        AND AWAIT FORMAL DIRECTION PRIOR TO COMMENCING CIVIL WORKS.
                                                                                                                                                                                                                          C30                                    ROADS AND DRAINAGE LAYOUT PLAN
7.      ON COMPLETION OF SERVICES INSTALLATION, ALL DISTURBED AREAS SHALL BE                                                                                                                                              C31                                           DRIVEWAY SECTIONS
        RESTORED TO ORIGINAL LEVEL, INCLUDING KERBS, FOOTPATHS, CONCRETE AREAS,
        GRAVEL AREAS, GRASSED AREAS AND ROAD PAVEMENTS.                                                                                                                                                                   C32                                          STORMWATER SECTION
8.      CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIR OF ANY DAMAGE TO                                                                                                                                                       C33                                      STORMWATER CATCHMENT PLAN
        AUTHORITY/COUNCIL'S INFRASTRUCTURE. SUCH REPAIR OR REINSTATEMENT TO BE
        CARRIED OUT IMMEDIATELY TO THE SATISFACTION OF INFRASTRUCTURE
        OWNER/MANAGER / AUTHORITY/COUNCIL.




                                                                                                                     CLIENT DETAILS:                                                PROJECT ADDRESS:                     APPROVED BY:                  PROJECT NAME:

                                                                                                                                                                                                                                                       6 WYANDRA STREET, NOOSA HEADS
                                                                                                                                   CAPITAL PRUDENTIAL                                                                                                  TITLE:                        STATUS:

                                               D    21/10/2022 REISSUED FOR APPROVAL        MVP         BP     NW                                                                                6 WYANDRA STREET                                      GENERAL NOTES                 FOR APPROVAL
     © ABN 89 647 469 707                      C
                                               B
                                                    11/07/2022 ISSUE FOR OPW
                                                    24/06/2022 UPDATE ISSUE FOR MCU
                                                                                            BP
                                                                                            BP
                                                                                                       NW
                                                                                                       NW
                                                                                                               NW
                                                                                                               NW                                                                                   NOOSA HEADS                NATHAN WAGSTAFF                                       NOT FOR CONSTRUCTION
   75 NOOSA DRIVE                                                                                                                                                                                                                 RPEQ: 20693
                                               A    30/03/2022 ISSUED FOR MCU               BP         NW      NW    SCALE:
NOOSA HEADS, QLD 4567                                                                                                                                                                                                               CPEng
    +61 7 5211 1003                           REV    DATE              DESCRIPTION          DWN        CHK    APP
                                                                                                                                                 N.T.S                                                                          DATE: 28/10/2022
                                                                                                                                                                                                                                                       DRAWING NUMBER:               PROJECT NUMBER:   SHEET REV:
                                                                                                                                                                                                                                                                                                        SIZE:
RECORCONSULTING.COM                                                             REVISIONS
                                                                                                                                       DO NOT SCALE, IF IN DOUBT ASK
                                                                                                                                                                                                                                                       C01                           20220078          A1 D
Log in to download the original file

RFI - engineering response plans.pdf · 2.6 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.