Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

Swmp

of 42

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 10, section 1. The text section number identifies this passage in the reader.

     2. A shakedown area is to be installed at the construction entry/exit to the proposed development area to
        minimise sediment being transported to and from the site.

     3. Diversion of upstream catchments around any exposed areas using diversion drains around the site.


     4.2. Operational Phase
The development consists of a duplex situated within a small allotment in a residential area. Rainwater from the
roof catchments will be captured and used for reuse on site, removing pollutants that would otherwise be
discharged. As the proposed development is not considered to significantly alter the pollutant generation
potential of the site, no additional stormwater treatment is considered necessary for the development.




Project number 20230023                                                                                 Page 10 of 14
File 20230023 206 David Low Way SWMP.docx, 2023-10-17 Revision 1

P +61 7 5211 1003                A 75 Noosa Drive, Noosa Heads, Qld 4567   E [email protected]    recorconsulting.com
Log in to download the original file

SWMP.pdf · 7.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.