Swmp
Original PDF page 10, section 1. The text section number identifies this passage in the reader.
2. A shakedown area is to be installed at the construction entry/exit to the proposed development area to
minimise sediment being transported to and from the site.
3. Diversion of upstream catchments around any exposed areas using diversion drains around the site.
4.2. Operational Phase
The development consists of a duplex situated within a small allotment in a residential area. Rainwater from the
roof catchments will be captured and used for reuse on site, removing pollutants that would otherwise be
discharged. As the proposed development is not considered to significantly alter the pollutant generation
potential of the site, no additional stormwater treatment is considered necessary for the development.
Project number 20230023 Page 10 of 14
File 20230023 206 David Low Way SWMP.docx, 2023-10-17 Revision 1
P +61 7 5211 1003 A 75 Noosa Drive, Noosa Heads, Qld 4567 E [email protected] recorconsulting.com
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.