3.2. Rainwater Reuse
In accordance with the Noosa Shire Council Sustainable Building Design Code AO2.1, rainwater reuse is required
for any future dwelling proposed on the new lot. This is to comprise of a minimum of 3,000L of rainwater storage to
capture and reuse for non-potable purposes including internal toilets and laundry supply as well as external
irrigation points. The 3,000L storage tank is to be connected to the maximum possible roof area of the proposed
dwelling.
Project number 20220217
Page 10 of 16
File 20220217 Pavilion St SWMP Rev1.docx, 2023-04-19 Revision 1
P +61 7 5211 1003 A 75 Noosa Drive, Noosa Heads,Qld 4567 E [email protected] recorconsulting.com
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.