Figure 3.1 – DRAINS Pre-development catchment
Figure 3.2 – DRAINS Post-development catchments
The results of the modelling against the range of design storms for the development under the existing and
proposed development conditions are shown in Table 3.1 Existing and proposed unmitigated site peak discharge.
Table 3.1 Existing and proposed unmitigated site peak discharge
Pavilion Street
Qchange
A.E.P Qexisting Qproposed Qchange (%)
(m³/s) (m³/s) (m³/s)
63.2% AEP 0.035 0.033 -0.002 -6%
0.5 EY 0.052 0.057 0.005 10%
0.2 EY 0.081 0.084 0.003 4%
10% AEP 0.100 0.102 0.002 2%
5% AEP 0.124 0.126 0.002 2%
2% AEP 0.156 0.156 0.000 0%
1% AEP 0.172 0.172 0.000 0%
Despite the increase in impervious area, the combined effect of the changes resulting from the development will not
alter peak flows to a significant extent. The combined peak discharge from both lots increases the site run-off by a
maximum of 5L/s, or 2.5L/s for each lot. Within the context of the locality, being low density residential sites on large
allotments, this level of increase will not result in significant impacts or nuisance to the downstream nor damage to
the downstream property. Attenuation is therefore not considered necessary for the future development of the lots
where total impervious area of the lots is up to 40% impervious. Beyond this, further assessment may be necessary.
Project number 20220217
Page 9 of 16
File 20220217 Pavilion St SWMP Rev1.docx, 2023-04-19 Revision 1
P +61 7 5211 1003 A 75 Noosa Drive, Noosa Heads,Qld 4567 E [email protected] recorconsulting.com
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.