Attachment 6 - Acoustic Report (Updated) 20.08.2020 · OPW20/0145
Predicted Incident Noise Level Acoustic
Receiver1 Time
at Facade dB(A) Treatment
Internal
Compact. Mech.
Required
Noise Level
LA12 Plant3 to Achieve
Loading Criteria
LAeq Indoor
Dock, LA1 dB(A)
Noise
Limit4
Evening N/A 35 LAeq,adj,1hr
44 40 LA1,adj,1hr
Night
30 LAeq,adj,1hr
Day 62 63 56 45 LA1,adj,1hr Type B
Evening N/A 35 LAeq,adj,1hr
Lot 19 Level 2
45 40 LA1,adj,1hr
Night
30 LAeq,adj,1hr
Day 66 64 58 45 LA1,adj,1hr
Lot 21 Ground Evening N/A 35 LAeq,adj,1hr
Type B
level
38 40 LA1,adj,1hr
Night
30 LAeq,adj,1hr
Day 70 69 61 45 LA1,adj,1hr
Evening N/A 35 LAeq,adj,1hr
Lot 21 level 1 Type C
45 40 LA1,adj,1hr
Night
30 LAeq,adj,1hr
Day 70 69 62 45 LA1,adj,1hr
Evening N/A 35 LAeq,adj,1hr
Lot 21 level 2 Type C
47 40 LA1,adj,1hr
Night
30 LAeq,adj,1hr
1
Refer to Figure 2 for location on map
2
Compactor and associated plant only operational between 7am and 6pm. On that basis, at other times
noise impact is N/A – not applicable
3
Exhaust fan and other plant adjacent to loading docks only operational between 7am and 10pm.
4
Based on most exposed rooms and building locations as per Figure 4 The rooms assume typical bedroom
and living room dimensions with bedroom glazed façade area of 7.4m2. Subject to final room and building
layouts and the shielding offered by other buildings, the façade acoustic treatment requirements may differ
and would need to be reviewed after plans are finalised.
I:\Jobs\2019\20191414\20191414.2\20200827OBA_R2_Noise_Impact_Assessment.docx 24
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 6 - Acoustic Report (Updated) 20.08.2020.pdfRelated documentApplication case desk ↗