Minor Change Existing Approval - 51995 1645 01 (As Published) · 51995.1645.01
7. There is to be no detrimental effect upon the amenity of the neighbourhood by reason of the
creation of excessive noise, lighting nuisance or other emissions.
8. The open space and setback area are to be landscaped in accordance with Council’s Policy
on Landscaping Guidelines and a properly prepared landscape plan to be submitted to and
approved by the Shire Planner, prior to the issue of a Building Approval. Such landscaping
is to be completed in accordance with the approved landscape plan, prior to the premises
being occupied and maintained at all times thereafter to the reasonable satisfaction of the
Shire Planner.
9. This landscaping plan is to provide dense screen landscaping for a minimum of 6.0m along
Noosa Drive frontage, 3.0m along the northern boundary to the carpark ad to the rear (east)
of the proposed deck area. This landscaping plan is to indicate detail of proposed fencing
and screening to these areas. These details are to discourage the uncontrolled crossing for
patrons from the footpath or carpark into the area.
10. Existing trees on the site and within road reserves are to be retained, except where required
to be removed due to building operations or the conduct of the approved use. The landscape
plans referred to above are to denote area of existing vegetation or existing trees proposed
to be retained.
11. Construction work and other associated activities are permitted only during the hours of
7.00a.m. to 6.00p.m. Monday to Saturday. No work is permitted on public holidays, except
where extended hours are approved by the Building Surveyor.
12. Any advertising sings or devices is to comply with the provisions of Council’s policies on
advertising.
13. Payment of contributions in accordance with Council’s Policy on Water Supply and Sewerage
Headworks. An estimate only of the charges as at June 1995, under the current policy is as
follows:-
Water Supply - $4302
Sewerage - $3967
TOTAL: $8269<
Please note that the headworks charges will alter in accordance with Price Index variations
or if any amendment is made to Council’s policy.
Headworks contributions shall be calculated and paid in accordance with either of the
following alternatives: -
13.1. Payment to be made prior to the issue of a Building Approval in the amount calculated
under the Policy at that date; or
13.2. Payment may be deferred to a date:-
13.2.1. prior to Council sealing plans of the development for titling purposes; or
13.2.2. prior to the issue of a Certificate of Classification for any building approved
under this application; or
13.2.3. prior to commencement of the approved use at the relevant premises;
Whichever is the sooner. Payment of deferred headworks contributions shall also be subject
to the following requirements:-
13.2.4. Submission of a trading bank guarantee to the value of headworks
assessed at the time prescribed by the Local Government (Planning and
Environment) Act 1990, plus 20%, prior to Building Approval;
Page 3 of 7
Document Set ID: 23993968
Version: 4, Version Date: 05/08/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Existing Approval - 51995 1645 01 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 166 KB (small file)
- File type
No other editions are linked here.