Council archive · source document
Minor Change Existing Approval - 51995 1645 01 (As Published) · 51995.1645.01
13.2.5. Headworks shall be calculated as the value of headworks assessed at the
time prescribed by the Local Government (Planning and Environment) Act
1990, plus interest charged at the rate set by the Queensland Treasury
Corporation for Local Government borrowings as they apply to Noosa
Shire. The interstate used shall be the rate current at the “time prescribed”
above;
13.2.6. Should the contributions not be paid at the due time, Council shall call upon
the security Lodged; and
13.2.7. in the case of a building permit, if a permit expires the securities held will be
returned.
14. The developer shall bear the cost of alteration of any public utility or other facilities
necessitated by the developer of the land or associated construction works external to the
site.
15. Connection to Council’s existing water supply and sewerage reticulation systems at the
developer’s expense to the standards and requirements of Council’s Shire Engineer.
16. Submission of two sets of professionally drawn scale plans in compliance with Council’s
Code controlling food establishments for approval by Council’s Health Surveyor, for any food
premises proposed to be included in development. Approval is to be obtained prior to fitting
out the building.
17. Provision of any imperviously paved and drained area to be drained to Council’s to sewer to
accommodate all refuse containers to the reasonable satisfaction of Council’s Health
Surveyor. This area is to be aesthetically screened from any road frontage or adjoining
property boundary and is to be setback a distance of two (2) metres from any road frontage.
A suitable hosecock and hose are to be located in the vicinity of the refuse container area.
18. Provision of separate toilet facilities for patrons, in addition to staff toilet facilities, in
accordance with Council’s Policy of 16th October, 1985.
19. The footpath and setback areas are to be kept clear of goods, signs and street furniture not
approved by Council.
20. Submission of a cash bond or trading bank guarantee to the sum of $3,000.00 secure
performance of conditions, prior to the issue of a Building Approval. The cash bond or trading
bank guarantee will be returned upon performance of the conditions of approval.
21. The provisions of this approval are to be effected, prior to the commencement of the
approved use. Council reserves the right to call upon the bond or guaranteed sum referred
to in this approval to effect compliance with conditions.
22. The Town Planning Consent Permit may be revoked pursuant to section 4.14 pf the Local
Government (Planning and Environment) Act if commencement of erection or works have
not been made in accordance with that Permit or the rights conferred by that Permit are not
exercised within two (2) years of the date of issue of the permit.
23. The Town Planning Consent Permit lapses where:-
23.1. the use or erection of a building or other structure associated with the use, has not
been commenced within four (4) years of the date of issue of the Town Planning
Consent Permit, unless application is made and approved by Council for an extension;
or
23.2. the use of any premises pursuant to the Town Planning Consent Permit ceases for a
period of twelve (12) months.
5. REFERRAL AGENCIES
Not applicable.
Page 4 of 7
Document Set ID: 23993968
Version: 4, Version Date: 05/08/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Existing Approval - 51995 1645 01 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 166 KB (small file)
- File type
No other editions are linked here.