Skip to the record
NoosaWatch™: The source of truth.

Council archive · source document

001ABA64.001

of 34

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Text sections not matched to the original PDF pages. See original document to check page numbers.

INTEGRATED PLANNING ACT 1997                                                                                 IDAS Assessment Checklist, Version 22
           ETHAN 4 cote                      ect        epee col a ON            eaU ERI Ma       OREM Cee CMO ME RC Meee |                        ea
           nS ECTIO N Al = Section 1 must be completed for all applications that require completion of the IDAS Assessment Checklist’. ° 9/484

           1.4A      Is any part of the proposal intended to be carried out on a Queenstand heritage place under the Queensland Heritage Act 1992?
                        XX] No-Goto178        [_] Yes
                      IPA, schedule 2. part 7. fable 5, tem ZIP Reguistion. schedule 2. table 2, Hem 18.
           1.1B      Does the proposal involve development intended to be carried out on a place entered in a local heritage register under part 11 of
                     the Queensland Heritage Act 1992, other than if the place is on Cairns or Mackay airport land?
                       (X] No-Gotoa12         [-]} Yes
                      IPA, schedule 8. part 7. table 5. tem 2A, if Regulstion, schedule 1. part 2. table 5. tem 2.
           REMOVING QUARRY MATERIAL; WILD RIVERAREA Sac),                            Gia            gms: wear                      «wea            om
           1.2       Does the proposal involve removing quarry material from a watercourse or lake as defined under the Water Act 2000?
                      DX] No-Gotoat.3      [_] Yes
.                     IPA, schedule 8, part 1, lable 5. Hen: 1; IP Regulation, schedule 2, table 2, item 11; IP Regulation, schedille 1, table 5, tem 2 (wild river areal: Water Act 2000,
                      section 965C; Wild Rivers Act 2005, sestion 43A
          [ENVIRONMENTALLY RELEVANT ACTIVITY; WILD RIVER AREA                        ee: So          Lie             he ih          Se cae            dl
           1.3       Does the proposal involve an environmentally relevant activity (ERA), other than a mining activity or a petroleum activity?
                          No-Gotogt.4¢      [_] Yes
                      IPA, schedule 8, part 1, table 2. item 1; IPA, schedule &, part 1, table 5, tems 3 and 4: IP Regulation, schedule Z, table 2, tems 1 and 2: Environmental Protection Act 194, ssction
                      734A (wid river area}; Witt Rivers Act 2005, section 434: relevant wed river dectarahon; Wid Rivers Coda.
          WITHIN THE LIMITSOFAPORT                          ee                                                                        wie    se
           1.4       ls any part of the premises within the limits of a port under the Transport Infrastructure Act 1994?
                     BX] No - Goto Q1.5
                     [_] Yes
                      iP Regulation, schedule 2, table 2. items 15 and 76
           DECLARED FISHHABITAT AREA.                                 Bee                                                                             xa
           1.5       Does any part of the premises adjoin a declared fish habitat area under the Fisheries Act 1994?
                     DX] No - Goto 01.6
                     CJ Yes - if answers to questions in other sections of this checklist indicate that the proposed development is assessable under IPA, sch@
               ,               8, this application requires assessment by the Department of Primary Industries and Fisheries (DPI&F). ff DPI&F is not the
                               Assessment Manager for the application, the agency has jurisdiction as Advice Agency.
                      IP Regulation, schedule 2, table 2, item 26
          COMMUNITY INFRASTRUCTURE 2                                                                                 Ee              eee
           1.6       Is any part of the premises designated for community infrastructure?
                     [X] No - Goto 01.7
                     [_] Yes
                      IP Regulelion, schediile 2, table 3, tem 7
          WASTE WATER MANAGEMENT.                        ae See                              NS       me                   Pe                ee      ey
           17        Does the proposal involve the establishment or expansion of a waste water disposal system?
                      [X] No - End of Section?  [_] Yes
                      IP Regulation, schedule 2, table 3, item 5

Used in these records

About this file

File size
2.4 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

001ABA64.001.pdf · 2.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.