af                                                           .
    “s       INTEGRATED PLANNING ACT 1997                                        .                                           IDAS Assessment Checklist, Version 22
              CE FOTIA NA                                   ee                     EES Oe          ee        er oo ee a                                enna           °
                EGE 0 Ds Ap ee eee el ce             Sa ARRAN Ca) Hie aaa she              lors Mn On ajc vi  pe vs  Ns SSP      MEE ane Aa aa
             SECTION?           4    sccion 4 must be completed when the application             seeks'approval (6 camry out operational work su ac
              .    UTTAR ES OP Ie Re  ee         i          ag  he ee   re ee ee               Mt Re          Le PEP TEC EMME ER op trea he          ee
             41        ls the proposed operational work assessable under any State planning regulatory provisions?
  -                     []No        XJ Yes
.                             "If yes, is the proposed operational work assessable under the planning scheme?
;:                             [X] No - Answer 04.1.1- 4.1.7  [[] Yes - Complete Form 1, Part E and answer 04.1.1 - 4.1.7 below
 |                                                         So                    ee                  ee ee                                oo           ae
                   <br ah; ;    LED:            Dinges oecaa Ng     ae  ge gant   se RIS ae EY 8 a   fi ase eM ds dane erie eine Sano palais teaite atest sien SRM RNa aut a ete ce
             4.1.1     Is any part of the premises located in part of a future State-controlled road, or within 100m of a State-controlled road?
                        [X}No       [] Yes
                               If no, is the proposed operational work for filling or excavating listed in Integrated Planning Regulation 1998,        ;
                               schedule 5 and does it exceed the threshold?                                                                                ;
           ;                   [X] No - Gotoa4.1.2
                               C Yes - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.
                         IP Regulation. schedule 2. table 3, tam 3; IP Regulation, schedule 2. table 3, item 1(b)
        QO NCDSULEATE: SOLS               ee               a         ee                         fe
              Sd ht    ie dati atc ds EGG we Pd AONE SELL ie ee Se Re ee      NT eg         eR Re ra                              SRE EEE: iene ni         nea
             4.1.2      Is any of the operational work proposed in a local government area listed*' in State Planning Policy 2/02: Planning and Managing
                       Development Involving Acid Sulfate Soils
                       [[] No -Gotoa4.1.3            X] Yes
             4Taurukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Bumett, Caboolture, Caims, Calliope, Caloundra, Cardwell, Carpentaria, Cook, Cooloola, Douglas,
             Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrook, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Mirium Vale, Momington, Noosa, Pine Rivers,
             Redcliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday
                               If yes, is the natural ground level of any point where work is being carried out less than 20m AHD?
                               [_] No
                                  Yes                -
                      mo,        ..   If yes, does the proposed operational work involve the following?
                                     (i)   Excavating more’ than 1,000m? of soil or sediment at or below 5m AHD                           No    4: (J Yes
                                      (ii) Filling the premises with 1,000m? or more of material with an average depth of             & No         CT] Yes        -
                                          0.5m on land, soil or sediment at or below 5m AHD                                                            ,
                                                                                                                                                                       2
                                      If yes to either or both (i) or (ii) above - This application must to be referred to the Department of Natural Resources and Water (NRW)
         ©}                                                                     as Advice Agency
                         IP Regulalion, schedule 2, table 3. tem 4; Slate Planning Policy 2/02: Pianning and Managing Development involving Acid Suffate Soils, section 3.6
             EASEMENTS AND SUBSTATIONS: Si                                                                                               ee
             EASEMENTS ANO-SURGTATIONG. Conte ee ee ea                                                eh ee                                                 an
             H            f      i           .        eee  f     ‘id, aay          ete taht ae   Kiso ote tae let EWEN Loic e cheat yee Pha ah gen rere ne oa Bias ae
              4.1.3    Is any of the proposed operational work for filling or excavation?
                        IX] No -Goto 4.14
                        [_] Yes
                         IP Reguiation, schedule 2, tadie 3 tem 10(a), IP Regulation. schedule 2. table 3, item 10/b)                                                 .
             4.1.4     Is any part of the premises subject to an easement in favour of the holder of Pipeline Licence Number 1 issued under the
                        Petroleum Act 1923 for the construction or operation of the Moonie to Brisbane strategic pipeline under that Act?
                         XJ No -Gotoa47.5      [] Yes
                         IP Regulation, schedule 2, table 3, lem 17
             PUBLIC PASSENGER TRANSPORT                 gh      ie                                                                                   ee
              ES ee                 a eee Cen. See                            me eee EMR Ree                               ee a     eee ee
             4.1.5     Is any of the proposed operational work listed in schedule 13C of the integrated Planning Regulation 1998 and does it exceed the                .
                        specified threshold?
                              No- Go to 04.1.6   [_] Yes - This application must be referred to QueenslandTransport (QT) as Concurrence Agency.
                 .       IP Reguiation, schedule 2, table 3. item 14

Used in these records

About this file

File size
2.4 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

001ABA64.001.pdf · 2.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.