Skip to the record
The gold standard in government transparency.

Council archive · source document

001ABA64.001

of 34

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Text sections not matched to the original PDF pages. See original document to check page numbers.

Ay                         TTAB             ,                          ‘                      ee
  me              ot                                        (DERM Permit-number: IPCC01428009°. wo

  >) : General Permit Condition              =              pa                   a
   pe ~~” Agency Interest: Coastal         |                              "            :      - : .   |   oe
     "4" ": All works are to be constructed in accordance with the attached approved drawings and specifications
        .  °° ...> listed.in'the approved plans section in the notice.attached to this permit. °°.
      5   2.        The chief executive administering the Coastal Protection and Management Act.1995'may order the |. ~
  ss               works to be removed or modified, within a reasonable time, if the works have or.are likely tohavea =... -
         te     SS . Significant effect on coastal management because.the works; 2 ..    Pe           a        ar.
         SF         (a) eréate'a navigation hazard:or othier danger tothe publicor
  SO         ,    .-(b) cause erosion or land‘degradation; or. =
  ae               — {e) are unstable or have not been constructed according.to the approved plans. =        Os
  "+ -" 3: “All reasonable and practicable measures must be taken to prevent pollution of watercourses or.
      @ .          : Stormwater systems as a result of silt run-off, oil and grease spills from machinery, concrete truck
  _     7”      >   washout and alike: Concrete agitator wash out must only be conducted in a specified area to facilitate = —
OOD.                the removal of waste concrete from the area to landfill. Wastewater from cleaning equipment must not. -
  Do               . be discharged directly or in-directly to.any. watercourses or stormwater systems... 0.       an
=         Ageney Interest: Water
  ...,   4° . There is to be no visible sediment plume greater than 30 metres from the proposed structure. Ifa
    So...           visible plume exists 30 metres:from the: proposed structure, works-must immediately cease anda  .
   "J+... , .$ediment curtain must be ‘positioned around the plume. until it has.settled and is no longer visible. ©

         page seta                                                 Bepatment of Environment and Resource Management

Used in these records

About this file

File size
2.4 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

001ABA64.001.pdf · 2.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.