Skip to the record
Every meeting, every word.

Council archive · source document

001ABA64.001

of 34

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Text sections not matched to the original PDF pages. See original document to check page numbers.

t                           “                                         :                    ao  ie ve
  Te                                                         DERM Permit number: IPCC01428009

         Words and phrases used throughout this permit’ are defiried below. Where a definition for a term used in this.
          permit’ is sought and the term is not defined within this permit’ the definitions provided. in the relevant legislation
      -   shall be used.     eo         a,                      BO                        oo            wo,
    __:,"approval" means ‘notice of development application decision’ or ‘notice of concurrence agency response’
         under the Integrated Planning Act 1997. Po                      Be                              me
  .  *. “approved plans” means the plans and documents listed in the approved plans section. in thie notice attached’
   SO    to this development approval. : we           eg ates bre                     bs
‘« . \” “Department of Environment arid Resource Management” means the department or agency (whatever.              .
fo       called) administering the ‘Coastal Protection and Management Act 1995 or thé Environmental Protection Act: oo
  os): “land: in.the "land schedule” of this document means land excluding waters and the atmosphere. : >
  "|. “site” means land or tidal waters on or in which it is proposed to carry out the development approved under this . |
  ..."   @evelopment approval. ©                                              Mi
   ©  @ watercourse" means a river, créek or stream in which water flows permanently or intermittently:
  “a> in’a natural channel, whether artificially improved ormotor         BU                    a        oe
           + inanartficial channe! that has ctianged the course of the watercourse, "8
   .   |: “waters” includes river, stream, lake, lagoon, pond, swamp, wetland; unconfined surface water, unconfined: .: -
   _    "Water natural or artificial watercourse, bed and bank of any waters, dams, non-tidal or tidal waters (including the. .
   _.   + $@a), stormwater.channel, stormwater drain, roadside gutter, stormwater run-off, and groundwater and any part-..
  -.     thereof                                                                      ee
  ~~” |, “works” of “operation” means the development approved under this development approval, 9
         "you means the holder of this development approval or owner / occupier of the land which is the subjectof
   _., this developmentapproval     =                                                                       re

  se a ‘Page 4.0t 4 = Me   : epee  Se:              . : ca, a Oo . Bopartment of Environment and Resource Management - he

Used in these records

About this file

File size
2.4 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

001ABA64.001.pdf · 2.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.