Original source · versioned page text
Minor Change Report MCU25 0057 01, OPW25/0078.01 & RAL25/0010.01 [As Published]
Plan No. Rev. Plan/Document Name Date
2503 15 DA06 Section B prepared by Skale Building 9/07/2025
Design
760230 & 760231 - 20/03/2026
Annotated by Council
Sheet 09/19
Section prepared by Metricon
760230 & 760231 - Section prepared by Metricon 20/03/2026
Sheet 10/19
Existing Condition 26
Site Access and Driveways
26. A sealed access driveway must be provided from George Street to all parking and
manoeuvring areas of the development. The works must be undertaken generally in
accordance with SCG Consulting Engineer’s Operational Works Driveway & Access Plan
(00469-OW4.1) and Operational Works Driveway Details Plan (00469-OW4.2) dated March
25 and must include in particular:
a. a driveway crossover in accordance with Council’s standard drawings RS-049, RS-050
and any associated addendum.
Recommendation
During the assessment of this application, it was identified that this condition is required to be
updated to reference the amended plan, as shown below.
Site Access and Driveways
26. A sealed access driveway must be provided from George Street to all parking and
manoeuvring areas of the development. The works must be undertaken generally in
accordance with SCG Consulting Engineer’s Operational Works Driveway & Access Plan
(00469-OW4.1) and Operational Works Driveway Details Plan (00469-OW4.2) dated March
25 19 June 2026 and must include in particular:
a. a driveway crossover in accordance with Council’s standard drawings RS-049, RS-050
and any associated addendum.
Existing Condition 27
Pedestrian Facilities
27. Construct a 1.5 metre wide footpath within the road verge for the entire length of the site’s
frontage to George Street.
Condition 26 is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
infrastructure.
Recommendation
During the assessment of this application, it was identified that a typo graphical error was made
when referring to the condition number i.e. Condition 26. It is recommended that as part of this
minor change that the condition be updated to refer correctly to Condition 27.
Existing Condition 28
28. The site must be provided with a stormwater drainage system connecting to a lawful point of
discharge. The works must be undertaken generally in accordance with SCG Consulting
Engineer’s Operational Works Stormwater Management Plan (00469-SW1.1) dated March
25 and must include in particular:
a. 3,000L of on-site rainwater retention per dwelling.
Page 10 of 20
Document Set ID: 24926353
Version: 9, Version Date: 10/08/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.