Minor Change Report MCU25 0057 01, OPW25/0078.01 & RAL25/0010.01 [As Published]
Condition 27 is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
infrastructure.
Recommendation
During the assessment of this application, it was identified that this condition is required to be
updated to reference the amended plan, as shown below. Furthermore, this condition will be
updated to refer correctly to Condition 27.
28. The site must be provided with a stormwater drainage system connecting to a lawful point of
discharge. The works must be undertaken generally in accordance with SCG Consulting
Engineer’s Operational Works Stormwater Management Plan (00469-SW1.1) dated March
25 19 June 2026 and must include in particular:
b. 3,000L of on-site rainwater retention per dwelling.
Condition 27 28 is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
infrastructure.
Existing Condition 32
Earthworks and Retaining Walls
All earthworks and associated batters/retaining structures, both above and below ground level,
both temporary and permanent, must be undertaken in accordance with the conditions of this
approval, be generally in accordance with SCG Consulting Engineer’s Operational Works
Earthworks Plan (00469-OW3.1) dated March 25, and contained entirely within the subject site
unless written permission from the respective landowner(s) is provided to Council.
Applicant’s Request
The applicant has requested existing Condition 32 be amended to reference the updated
Earthworks Plans, as follows:
Earthworks and Retaining Walls
32. All earthworks and associated batters/retaining structures, both above and below ground
level, both temporary and permanent, must be undertaken in accordance with the conditions
of this approval, be generally in accordance with SCG Consulting Engineer’s Operational
Works Earthworks Plan (00469-OW3.1) dated March 25 119/06/2026 Rev B, and contained
entirely within the subject site unless written permission from the respective landowner(s) is
provided to Council.
Assessment of Request
It is agreed that the updated Earthworks Plan submitted during the assessment of this application
can be referenced in this condition.
Recommendation
It is recommended existing Condition 32 be amended to read as follows:
Earthworks and Retaining Walls
32. All earthworks and associated batters/retaining structures, both above and below ground
level, both temporary and permanent, must be undertaken in accordance with the conditions
of this approval, be generally in accordance with SCG Consulting Engineer’s Operational
Works Earthworks Plan (00469-OW3.1) dated March 25 119/06/2026 Rev B, and contained
entirely within the subject site unless written permission from the respective landowner(s) is
provided to Council.
Page 11 of 20
Document Set ID: 24926353
Version: 9, Version Date: 10/08/2026