Skip to the record
Search everything, all in one place.

Original source · versioned page text

Minor Change Report MCU25 0057 01, OPW25/0078.01 & RAL25/0010.01 [As Published]

of 20

Page text read automatically using OCR, there may be inaccuracies

                        Plan No.           Rev.       Plan/Document Name                           Date

                        760230 & 760231       -       First Floor Plan prepared by Metricon        20/03/2026
                        Sheet 04/19

                        760230 & 760231       -       First Floor Plan Left prepared by Metricon   20/03/2026
                        Sheet 04A/19

                        760230 & 760231       -       First Floor Plan Right prepared by Metricon 20/03/2026
                        Sheet 04B/19

                        760230 & 760231       -       Roof Plan prepared by Metricon               20/03/2026
                        Sheet 05/19

                        760230 & 760231       -       Elevations prepared by Metricon              20/03/2026
                        Sheet 06/19

                        760230 & 760231       -       Elevations prepared by Metricon              20/03/2026
                        Sheet 07/19

                        760230 & 760231       -       Section prepared by Metricon                 20/03/2026
                        Sheet 08/19

                        760230 & 760231       -       Section prepared by Metricon                 20/03/2026
                        Sheet 09/19

                        760230 & 760231       -       Section prepared by Metricon                 20/03/2026
                        Sheet 10/19

                      Earthworks and Retaining Walls
               32.    All earthworks and associated batters/retaining structures, both above and below ground
                      level, both temporary and permanent, must be undertaken in accordance with the conditions
                      of this approval, be generally in accordance with SCG Consulting Engineer’s Operational
                      Works Earthworks Plan (00469-OW3.1) dated March 25 119/06/2026 Rev B, and contained
                      entirely within the subject site unless written permission from the respective landowner(s) is
                      provided to Council.
               C.     Amend Condition 1 of the Development Permit for Operational Works to read as follows:
               1.     Development undertaken in accordance with this approval must generally comply with the
                      approved plans of development.

                         Plan No.            Rev.      Plan/Document Name                          Date

                         00469-OW3.1              B    Earthworks Plan prepared         by    SCG 19/06/2026
                                                       Consulting Engineers

                         00469-OW4.1              C    Driveway and Access Plan prepared by 19/06/2026
                                                       SCG Consulting Engineers

                         00469-OW4.2              B    Driveway Details prepared by SCG 19/06/2026
                                                       Consulting Engineers




                                                                                                     Page 18 of 20

Document Set ID: 24926353
Version: 9, Version Date: 10/08/2026

Log in to download the original (Minor Change Report MCU25 0057 01, OPW25_0078.01 & RAL25_0010.01 [As Published].pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.