Minor Change Report MCU25 0057 01, OPW25/0078.01 & RAL25/0010.01 [As Published]
00469-SW1.1 D Stormwater Management Plan prepared 19/06/2026
by SCG Consulting Engineers
090226 V2 Hardscape Plan prepared by Metricon 9/02/2026
1 of 3
090226 V2 Planting Plan prepared by Metricon 9/02/2026
2 of 3 Annotated by Council
090226 V2 Details Plan prepared by Metricon 9/02/2026
3 of 3
D. Amend Condition 3 of the Development Permit for Reconfiguring a Lot to read as follows:
3. Development authorised by this approval must be undertaken generally in accordance with
the Approved Plans listed in the table/s below.
Plan No. Rev. Plan/Document Name Date
20/19 4 Subdivision Plan prepared by Metricon 20/03/2026
E. Correct administrative matters relating to Conditions 26, 27, 28 and 29, as follows:
Site Access and Driveways
26. A sealed access driveway must be provided from George Street to all parking and
manoeuvring areas of the development. The works must be undertaken generally in
accordance with SCG Consulting Engineer’s Operational Works Driveway & Access Plan
(00469-OW4.1, Rev C) dated 19/06/2026 and Operational Works Driveway Details Plan
(00469-OW4.2, Rev B) dated 19/06/2026 and must include in particular:
a. a driveway crossover in accordance with Council’s standard drawings RS-049, RS-050
and any associated addendum.
Car Parking
27. A minimum of 4 car parking spaces must be provided and marked on the site and generally
in accordance with SCG Consulting Engineer’s Operational Works Driveway & Access Plan
(00469-OW4.1) dated 19/06/2026 and must include in particular:
a. dimensions, crossfalls and gradients in accordance with Australian Standard AS2890:
Parking Facilities
Pedestrian Facilities
28. Construct a 1.5 metre wide footpath within the road verge for the entire length of the site’s
frontage to George Street.
Condition 28 is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
infrastructure.
Stormwater Drainage
29. The site must be provided with a stormwater drainage system connecting to a lawful point of
discharge. The works must be undertaken generally in accordance with SCG Consulting
Engineer’s Operational Works Stormwater Management Plan (00469-SW1.1) dated 19 June
2026 and must include in particular:
a. 3,000L of on-site rainwater retention per dwelling.
Condition 29 is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
infrastructure.
Page 19 of 20
Document Set ID: 24926353
Version: 9, Version Date: 10/08/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.