Bushfire Hazard Assessment & Management Plan v1 - 60 Glenridge Drive COOROIBAH

of 45

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 27, section 1. The text section number identifies this passage in the reader.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Bushfire Hazard Assessment & Management Plan v1                                                                                                                                                                NCES REF: J001001
Lot 47 on RP860577 – 60 Glenridge Drive, Cooroibah




Table 5 – Table 8.2.3.3 Bushfire Hazard Areas – Part 8 Overlay Code Noosa Plan 2020


 PERFORMANCE OUTCOMES                                            ACCEPTABLE OUTCOMES                                                       PROPOSED SOLUTION

 Safety of people and property

 PO1                                            AO1.1                                                                                      This Bushfire Hazard Assessment and Management Plan has been prepared to
 Development maintains the safety of people and Development which will materially increase the number of people                            maintain the safety of people and property from the adverse impacts of bushfire.
 property from the adverse impacts of bushfire. living or congregating on premises, including reconfiguring a lot, is not
                                                                                                                                           AO1.1 –The proposed building envelopes and APZ’s are located outside of a
                                                located within a medium or high bushfire hazard area.
                                                                                                                                           mapped medium or high bushfire hazard area as depicted on the Local Hazard
                                                                                                                                           Area Map BF03.
                                                                 AO1.2
                                                                 Development maximises setbacks from hazardous vegetation to               AO1.2 – The development has provided minimum setbacks between the
                                                                 achieve an acceptable risk.                                               proposed building envelopes and hazardous vegetation to achieve the SPP
                                                                                                                                           Assessment Benchmark 4 criteria of <29kW/m2 radiant heat flux exposure. This
                                                                 Editor’s Note —PSP8 Natural Hazards provides guidance for                 setback achieves an acceptable risk where all the mitigation measures detailed
                                                                 assessing bushfire hazard risk and preparing a bushfire hazard            within this report are employed.
                                                                 management plan.


 Impact on Ecologically Important Areas

 PO2                                                  No acceptable outcome provided                                                       No clearing of vegetation for bushfire mitigation measures is required. The
 Bushfire mitigation measures do not adversely impact                                                                                      bushfire mitigation measures prescribed herein will not adversely impact on
 on:                                                                                                                                       biodiversity values, connectivity, ecosystem functioning, and the long-term
                                                                                                                                           physical integrity of waterways, wetlands and areas of native vegetation.
 a) biodiversity values, connectivity and ecosystem
 functioning; and
 b) the long term physical integrity of waterways, wetland
 and areas of native vegetation.

 Water Supply for Fire Fighting Purposes

 PO3                                                        AO3.1                                                                          AO3.1 – No reticulated water is currently available to the site. The water supply
 Development provides an adequate water supply for Premises are connected to the reticulated water supply.                                 requirements of SPP Assessment Benchmark 4 prevails; 10,000KL, and can be
 firefighting purpose which is reliable, safely located and                                                                                conditioned with an approval.
 freely accessible.                                         Editor's note—For reconfiguring a lot, water supply needs to provide
                                                                                                                                           Note, the reliance upon dams or pools for water storage is not an acceptable
                                                            for a minimum flow and pressure of 10 litres a second at 200kPa at all
                                                                                                                                           solution under the SPP.
                                                            times for firefighting purposes.

                                                                 OR

                                                                 AO3.2
                                                                 Where there is no available reticulated water supply, the premises
                                                                 has:

                                                                 a) an accessible dam, swimming pool or water tank available for
                                                                 firefighting purposes with an onsite water volume of not less than
                                                                 5,000 litres; and
                                                                 b) a water supply outlet pipe 50 millimetres in diameter fitted with a
                                                                 standard fire brigade fitting connected to the water supply (other than
                                                                 where the water supply is in a swimming pool or dam).




© 2020                                                                                                           26
Log in to download the original file

Bushfire Hazard Assessment & Management Plan v1 - 60 Glenridge Drive COOROIBAH.pdf · 5.8 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.