5.3 On-site Detention
In order for the post-development stormwater discharge conditions to match the pre-development
conditions, it is proposed to incorporate an open detention basin with a maximum storage volume
of 240kL. The detention basin is to be located above ground within the southeast corner of the site.
The proposed OSD basin will have the following properties:
Specified base area = 81m2;
Specified internal depth = 1.5m;
Low flow orifice diameter = 0.12m;
Mid flow top of pit elevation from base of tank = 1.1m;
Overflow weir elevation from base of tank = 1.4m;
Overflow weir width = 7.5m;
Required basin volume = 210kL; and
Provided basin volume = 240kL.
The detention basin will be designed to contain all flows up to a Q20 storm event. Storm events
exceeding Q20 will be expected to sheet flow across the boundaries at or less than pre development
flows.
Refer to Appendix F for the Concept Site Levels and Drainage Plan which details the proposed on-
site detention system.
5.4 Comparison of Peak Flows at Lawful Point of Discharge
The pre-development and post-development mitigated peak flow rates were compared for each
catchment and are shown in Table 5-4 below.
Table 5-4 - Comparison of Peak Flows
XPSTORM
XPSTORM
ARI Post-development Flows
Pre-development Flows
(years) (Mitigated)
(m3/s)
(m3/s)
1 0.035 0.035
2 0.043 0.039
5 0.068 0.051
10 0.087 0.062
20 0.107 0.084
50 0.128 0.119
100 0.145 0.144
Site Based Stormwater Management Plan
Proposed Townhouse Development at 101-105 Eumundi Noosa Road, Noosaville
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.