Original source · versioned page text
Stormwater Management Plan - Rev 1
The original of this document is very large (12.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn 20169 - SBSMP/1
Page 9
5.1.5 Peak Flows
Refer to Table 5-3 for a summary of the predicted minor and major discharge rates for pre and
post development conditions and Appendix E for the Rational Method calculations.
Table 5-3 – Pre and Post Development Peak Flows
Property State Q1 (m3/s) Q2 (m3/s) Q5 (m3/s) Q10 (m3/s) Q20 (m3/s) Q50 (m3/s) Q100 (m3/s)
Pre development 0.089 0.106 0.161 0.197 0.235 0.297 0.339
Post development 0.126 0.151 0.231 0.286 0.342 0.436 0.491
The proposed development will result in an increase in impervious surface areas and will
consequently increase stormwater runoff peak flow rates.
Hence, it is proposed to utilise an on-site detention (OSD) system to mitigate the stormwater
runoff of the proposed development prior to discharging to the existing stormwater infrastructure
within Lot 46 and 62 on SP132578, southeast of the site.
Refer to Section 5.3 for the XPSTORM Modelling analysis of the site, Appendix E for the Stormwater
Quantity Calculations, Appendix F for the Concept Site Levels and Drainage Plan and Section 6 for
the Stormwater Quality Management Plan.
5.2 Proposed Drainage Patterns
The proposed drainage patterns are as follows (Refer to Appendix F):
Roof Catchment:
1. Runoff from the roof catchment of Townhouse Units 1-8 will flow via downpipes to a
rainwater tank located at the northwest corner of the site for rainwater reuse with
overflow discharging to the Lawful Point of Discharge within the Eumundi Noosa Road kerb
and channel.
2. Runoff from the roof catchment of the rest of the site will flow via downpipes an internal
drainage system, where it will be directed to the detention basin located at the southeast
corner of the site prior to discharge to the Lawful Point of Discharge within Lot 46 and 62
on SP132578.
Ground Catchment:
1. Surface runoff from the ground level hardstand and landscaping areas will be collected by
various stormwater pits connected to the internal drainage network, where it will be
directed to the detention basin located at the southeast corner of the site prior to
discharge to the Lawful Point of Discharge within Lot 46 and 62 on SP132578.
Refer to Appendix F for the Concept Site Levels and Drainage Plan.
Site Based Stormwater Management Plan
Proposed Townhouse Development at 101-105 Eumundi Noosa Road, Noosaville
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.