Stormwater Management Plan - Rev 1

of 93

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (12.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                                               20169 - SBSMP/1
                                                                                           Page 8




5 STORMWATER QUANTITY
A roof and allotment drainage system is to be designed to comply with:

    1. AS/NZS 3500.3:2015 - Plumbing and Drainage Part 3: Stormwater Drainage;

    2. The Queensland Urban Drainage Manual (QUDM), and;

    3. The Noosa Council Engineering Design Standards – Roads, drainage and earthworks.


5.1 Rational Method Assessment
The Rational Method has been used to calculate the peak discharges from the site under the
existing (pre development) and proposed (post development) conditions.

5.1.1 Design Storms
As defined in the Noosa Council’s Planning Scheme the following design storms were adopted:

    1. Minor Drainage System: 10 year ARI statistical flood (Q10 storm);

    2. Major Drainage System: 100 year ARI statistical flood (Q100 storm).

5.1.2 Rainfall Intensity
Rainfall intensities for this study were obtained from the Australian Bureau of Meteorology.

5.1.3 Times of Concentration
Times of concentration (tc) were calculated as defined in the QUDM. Refer to Table 5-1 for the
adopted tc’s and Appendix E for tc calculations.

                                    Table 5-1 – Adopted tc values
                                  Pre development        Post development
                                      tc (mins)               tc (mins)

                                        11.3                   5.6


5.1.4 Runoff Coefficients
The 10 year runoff coefficient’s (C10) were determined as defined in the QUDM. Refer to Table 5-2
below for the adopted C10 values.

                                     Table 5-2 – Adopted C10 Values

                                        Property State               C10

                                      Pre development                0.75
                                      Post development               0.85




Site Based Stormwater Management Plan
Proposed Townhouse Development at 101-105 Eumundi Noosa Road, Noosaville
Log in to download the original file

Stormwater Management Plan - Rev 1.pdf · 12.7 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.