Stormwater Management Plan - Rev 1

of 93

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (12.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
            PRINCIPLES OF OPERATION

The Filter has been extensively tested in the laboratory. This testing has been carried out using SIL-CO-SIL 106
as a sediment source. SIL-CO-SIL 106 is a silica product containing approximately 90% fine sediments (d50 = 23
microns), and is widely accepted as a sediment source for stormwater simulations by regulatory agencies such as
the Washington State Department of Ecology (TAPE) program, New Jersey Department of Environmental Protection
(TARP), as well as other leading agencies.

The SFC needs only 71cm of depth of water to begin full flow operation. Once the full flow operation has been
achieved, the SFC will operate to a depth of 16cm at which time the siphon will break and the system will backwash.
At this point the only flow is from the drain down cartridge which will drain the vault to a depth below 3cm.

Each SFC has a maximum nominal flow of 2.8LPS. At this flow, each cartridge can treat 68kg of the total
sediment load before maintenance. In addition, through the use of different size flow control orifice(s), the SFC flow
is regulated. As the flow is lowered, the treated sediment load increases. For example, when the flow is lowered to
0.94LPS, the cartridge is able to treat 136kg of the total sediment load before maintenance.




                                                           6
Log in to download the original file

Stormwater Management Plan - Rev 1.pdf · 12.7 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.