Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
CHAPTER
                                   INSTALLATION
       3
SPELFilter systems are installed along with the storm drain. Installation procedures vary depending on the
configuration of the SPELFilter system. Installation instructions for manhole SPELFilter systems and precast vault
SPELFilter systems are contained in this section.

Custom SPELFilter systems may have particular installation issues that will be addressed during the design.
Installation instruction for a custom SPELFilter will be included with the custom design documents.


INSTALLATION OF A SPELFILTER SYSTEM
1. Contact utility locator to mark any nearby underground utilities and make sure it is safe to excavate.
2. Reference the site plan and stake out the location of the SPELFilter manhole/vault.
3. Excavate the hole, providing any sheeting and shoring necessary to comply with all federal, state and local
    safety regulations.
4. Level the subgrade to the proper elevation. Verify the elevation against the manhole/vault dimensions, the invert
    elevations, and the site plans. Adjust the base aggregate, if necessary.
5. Have the soil bearing capacity verified by a licensed engineer for the required load bearing capacity. On solid
    subgrade, set the first section of the SPELFilter manhole/vault.
6. Check the level and elevation of the first section to ensure it is correct before adding any riser sections.
7. If additional section(s) are required, add a watertight seal to the first section of the SPELFilter manhole/vault. Set
    additional section(s) of the manhole/vault, adding a watertight seal to each joint.
8. Install the trolley system (if applicable). See separate instruction sheet.
9. Install the PVC outlet manifold. Glue all PVC joints with the exception of the SPELFilter cartridge coupling.
10. Install the PVC outlet pipe in SPELFilter manhole/vault.
11. Install the inlet pipe to the SPELFilter manhole/vault.
12. After the site is stabilized, remove any accumulated sediment or debris from the vault and install the SPELFilter
    cartridges.

Tool List:

t   PVC glue and primer
t   Crane / lifting mechanism to lower cartridges in to the vault (each cartridge weighs 350 lb)
t   Screwdriver or nut driver for Fernco couplers
t   Soft blow hammer
t   Saw (in case PVC manifold length needs to be adjusted)




                                                           18
Log in to download the original file

Stormwater Management Plan - Rev 1.pdf · 12.7 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.