Original source · versioned page text
2014-01-28 Planning & Organisation Committee Item 4.1 Attachment 1
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
12
Noosa Shire Council
Adopted Infrastructure Charges Resolution (No. 1) 2014
6. Desired standard of service
6.1 Purpose
Section 6 states the desired standard of service which is the standard guiding the
delivery of a trunk infrastructure network.
6.2 Desired standards of service for trunk infrastructure
The desired standard of service for each infrastructure network is detailed in the
Priority Infrastructure Plan for the specified Local Government Planning Scheme.
7. Establishment cost for trunk infrastructure networks
7.1 Purpose
Section 7 states the establishment cost for an identified trunk infrastructure
network.
7.2 Establishment cost for a trunk infrastructure network
The establishment cost for the trunk infrastructure networks are detailed in the
Priority Infrastructure Plan for the specified Local Government Planning Scheme.
Council Resolution dated 6 February 2014
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.