Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

2014-01-28 Planning & Organisation Committee Item 4.1 Attachment 1

of 32

Page text shows just the words. Original shows the document exactly as it was published.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

                                                13
                                        Noosa Shire Council
                       Adopted Infrastructure Charges Resolution (No. 1) 2014




Part 3               Adopted infrastructure charge

8.    Adopted infrastructure charge
8.1   Purpose

              Section 8 states the calculation of the adopted infrastructure charge to be levied by
              the following:

              (a)      the Council under section 648F (Adopted infrastructure charges notices)
                       of the Sustainable Planning Act 2009 for the transport, community
                       purposes and stormwater networks;

              (b)      the distributor-retailer under section 755KB (Funding trunk
                       infrastructure—levying charge on and from standard charge day) of the
                       Sustainable Planning Act 2009 for the sewerage and water supply
                       networks.

8.2   Calculation of adopted infrastructure charge

      (1)    An adopted infrastructure charge that may be levied for reconfiguring a lot is
             calculated as follows:

             AICROL = (ACROL x QROL) - D (as apportioned to each network separately)

             Where:

             AICROL is the adopted infrastructure charge that may be levied for reconfiguring a
                    lot.

             ACROL is the adopted charge rate for reconfiguring a lot stated in section 8.3
                   (Adopted charge rate).

             QROL      is the total no of lots.

             D         is the discount stated in section 8.4 (Discount).

             Note:

                      (a) for residential lot reconfiguration, the adopted infrastructure charge
                          is apportioned across all networks;

                      (b) for non-residential lot reconfiguration, the adopted infrastructure
                          charge apportionment excludes the stormwater charge component.

      (2)    An adopted infrastructure charge that may be levied for a material change of use
             or building work for residential development is calculated as follows:




                             Council Resolution dated 6 February 2014
Log in to download the original file

2014-01-28 Planning & Organisation Committee Item 4.1 Attachment 1(PDF, 1MB).pdf · 1.4 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.