Adopted Infrastructure Charges Resolution (No. 1) 2014
D4 is the discount stated in section 8.4 (Discount) for the transport, public
parks and land for community facilities, water supply and sewerage
networks.
DSW is the discount stated in section 8.4 (Discount) for the stormwater
network.
(4) The adopted infrastructure charge calculated in sub-sections (1), (2) and (3)
above is the resulting net adopted infrastructure charge applicable to the
development as apportioned to each network separately.
The apportionment of the resulting net adopted infrastructure charge to each
network is undertaken individually for each network by applying the network
allocations to the new development and the discount for existing lawful
development to obtain the net amount relevant to that network. Where this results
in a negative network amount for a particular network, the charge for that network
is set at zero. Any negative amount is not applied or carried across to the other
remaining networks.
8.3 Adopted charge rate
The adopted charge rate for:
(a) reconfiguring a lot, is the amount stated for Residential (3 or more
bedroom dwelling unit) in Table 13.1 (Schedule of adopted charges);
(b) a material change of use or building work for:
(i) residential development, is stated in Table 13.1 (Schedule of
adopted charges);
(ii) non-residential development other than special uses, is stated in
Table 13.1 (Schedule of adopted charges), which comprises the
following:
(A) the adopted charge rate for the transport, public parks
and land for community facilities, water and sewerage
networks in column 4; and
(B) the adopted charge rate for the stormwater network in
column 5;
(iii) non-residential development being special uses or other
development not otherwise identified in paragraphs (i) or (ii):
(A) the adopted charge rate for the transport, public parks
and land for community facilities, water supply and
sewerage networks in column 4, is the charge (in
column 4) for the charge category (in columns 1 & 2)
that the local government determines should apply for
the use at the time of assessment; and
Council Resolution dated 6 February 2014
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.