2014-01-28 Planning & Organisation Committee Item 4.1 Attachment 1

of 32

Page text shows just the words. Original shows the document exactly as it was published.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

                                        14
                                Noosa Shire Council
               Adopted Infrastructure Charges Resolution (No. 1) 2014



      AICR = Sum(ACR x QR) − D (as apportioned to each network separately)

      Where:

      AICR     is the adopted infrastructure charge that may be levied for a material
               change of use or building work for residential development.

      ACR      is the adopted charge rate for each defined use for a material change of
               use or building work for residential development stated in section 8.3
               (Adopted charge rate).

      QR       is the residential quantity for each defined use.

      D        is the discount stated in section 8.4 (Discount).

(3)   An adopted infrastructure charge that may be levied for a material change of use
      or building work for non-residential development is calculated as follows:

      AIC = AICNR + AICSW

      Where:

      AIC      is the adopted infrastructure charge for the total development

      AICNR = (Sum of (AC4 x Q4) for each defined use) − D4 (as apportioned to each
      network separately)

      AICSW = (ACSW x QSW) − DSW

      AICNR is the adopted infrastructure charge that may be levied for a material
            change of use or building work for non-residential development for the
            transport, public parks and land for community facilities, water supply
            and sewerage networks..

      AICSW is the adopted infrastructure charge that may be levied for a material
            change of use or building work for non-residential development for the
            stormwater network.

      AC4      is the adopted charge rate for each defined use for a material change of
               use or building work for non-residential development stated in section
               8.3 (Adopted charge rate) for the transport, public parks and land for
               community facilities, water supply and sewerage networks.

      ACSW     is the adopted charge rate for a material change of use or building work
               for non-residential development stated in section 8.3 (Adopted charge
               rate) for the stormwater network.

      Q4       is the non-residential quantity for each defined use.

      QSW      is the impervious area of the development.




                     Council Resolution dated 6 February 2014
Log in to download the original file

2014-01-28 Planning & Organisation Committee Item 4.1 Attachment 1(PDF, 1MB).pdf · 1.4 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.