Noosa Shire Council
Adopted Infrastructure Charges Resolution (No. 1) 2014
AICR = Sum(ACR x QR) − D (as apportioned to each network separately)
Where:
AICR is the adopted infrastructure charge that may be levied for a material
change of use or building work for residential development.
ACR is the adopted charge rate for each defined use for a material change of
use or building work for residential development stated in section 8.3
(Adopted charge rate).
QR is the residential quantity for each defined use.
D is the discount stated in section 8.4 (Discount).
(3) An adopted infrastructure charge that may be levied for a material change of use
or building work for non-residential development is calculated as follows:
AIC = AICNR + AICSW
Where:
AIC is the adopted infrastructure charge for the total development
AICNR = (Sum of (AC4 x Q4) for each defined use) − D4 (as apportioned to each
network separately)
AICSW = (ACSW x QSW) − DSW
AICNR is the adopted infrastructure charge that may be levied for a material
change of use or building work for non-residential development for the
transport, public parks and land for community facilities, water supply
and sewerage networks..
AICSW is the adopted infrastructure charge that may be levied for a material
change of use or building work for non-residential development for the
stormwater network.
AC4 is the adopted charge rate for each defined use for a material change of
use or building work for non-residential development stated in section
8.3 (Adopted charge rate) for the transport, public parks and land for
community facilities, water supply and sewerage networks.
ACSW is the adopted charge rate for a material change of use or building work
for non-residential development stated in section 8.3 (Adopted charge
rate) for the stormwater network.
Q4 is the non-residential quantity for each defined use.
QSW is the impervious area of the development.
Council Resolution dated 6 February 2014