Original source · versioned page text
2014-01-28 Planning & Organisation Committee Item 4.1 Attachment 1
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
20
Noosa Shire Council
Adopted Infrastructure Charges Resolution (No. 1) 2014
Table 10.1 Allocation of adopted infrastructure charge to the Council and the distributor-retailer
Column 1 Column 2 Column 3 Column 4
Applicable Planning areas Allocation of adopted infrastructure between the Allocation of adopted
local Council and the distributor-retailer (DR) infrastructure charge for
planning residential and non-
instrument Commercial Commercial Industry residential development
(Retail) (Office, Bulk not otherwise specified
Goods, in column 3
Showroom)
Unity Unity Unity
NSC NSC NSC NSC Unitywater
water water water
(%) (%) (%) (%) (%)
(%) (%) (%)
Cooroy & Lake MacDonald, Cooroibah, Mary River Catchment,
68 32 61 39 39 61 42 58
Boreen Point Kin Kin & Cootharaba
Tewantin & Doonan, Noosaville, Noosa Heads, Eastern Beaches
Noosa Plan 90 10 87 13 69 31 64 36
(Sunshine/Sunrise/Castaways Beach)
Eastern Beaches (Marcus/Peregian Beach)
85 15 80 20 60 40 51 49
Note: For non-residential development, the adopted infrastructure charge allocation excludes the stormwater charge which is allocated 100% to Council.
Council Resolution dated 6 February 2014
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.