Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

2014-01-28 Planning & Organisation Committee Item 4.1 Attachment 1

of 32

Page text shows just the words. Original shows the document exactly as it was published.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

                                                        21
                                                Noosa Shire Council
                               Adopted Infrastructure Charges Resolution (No. 1) 2014



10.3      Allocation of adopted infrastructure charge to trunk infrastructure networks

                     The proportion of an adopted infrastructure charge to be allocated to a trunk
                     infrastructure network for:

                     (a)       distributor-retailer trunk infrastructure, is stated in column 3 in Table
                               10.2 (Allocation of adopted infrastructure charge to trunk infrastructure
                               networks);

                     (b)       Council trunk infrastructure, is stated in column 4 in Table 10.2
                               (Allocation of adopted infrastructure charge to trunk infrastructure
                               networks). Sport and recreation uses are exempt from “Public parks and
                               land for community facilities” proportion of the adopted charge.

                     Table 10.2 Allocation of adopted infrastructure charge to trunk infrastructure
                     networks

Column 1            Column 2                      Column 3                                  Column 4
Adopted charge      Trunk                Allocation of distributor-       Allocation of Council’s proportion of adopted
                    infrastructure   retailer’s proportion of adopted      infrastructure charge to trunk infrastructure
                    networks to       infrastructure charge to trunk                        networks
                    which an              infrastructure networks
                    adopted charge
                    applies
                                     Water supply        Sewerage        Transport        Public parks       Stormwater
                                         (%)               (%)              (%)           and land for           (%)
                                                                                          community
                                                                                           facilities
                                                                                              (%)
Adopted charge      All Networks           40               60               40                50                 10
for residential     No Sewerage           100              N/A               40                50                 10
development:
(a) reconfiguring
a lot; or           No      Water
(b) a material      Supply & No           N/A              N/A               40                50                 10
change of use or    Sewerage
building work
Adopted charge      All Networks           40               60               85                15                N/A
for non-            No Sewerage           100              N/A               85                15                N/A
residential
development for     No      Water
(a)reconfiguring    Supply & No           N/A              N/A               85                15                N/A
a lot               Sewerage
Adopted charge      All Networks           40               60               85                15
for non-            No Sewerage           100              N/A               85                15            Calculated
residential
                                                                                                             Separately
development for     No      Water                                                                             100% to
(b) a material      Supply & No           N/A              N/A               85                15             Council
change of use or    Sewerage
building work
Adopted charge
for non-
                                                                                                             Calculated
residential
                    As determined by the local government that should apply for the use at the time of       Separately
development for
                                                     assessment.                                              100% to
(c) being special
                                                                                                              Council
uses or other
development




                                     Council Resolution dated 6 February 2014
Log in to download the original file

2014-01-28 Planning & Organisation Committee Item 4.1 Attachment 1(PDF, 1MB).pdf · 1.4 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.