Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

2014-01-28 Planning & Organisation Committee Item 4.1 Attachment 1

of 32

Page text shows just the words. Original shows the document exactly as it was published.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

                                                 23
                                         Noosa Shire Council
                        Adopted Infrastructure Charges Resolution (No. 1) 2014



               (c)     the claimant's estimate of the following:
                       (i)        the planned estimate of the trunk infrastructure land contribution;
                       (ii)       the planned or pre-market estimate of the trunk infrastructure
                                  works contribution;
                       (iii)      the value of the infrastructure offset for the trunk infrastructure
                                  contribution.
       (2)     The Council is to give a notice in the prescribed form to the claimant which states
               the following:
               (a)     whether an infrastructure offset is applicable or not;
               (b)     if an infrastructure offset is not applicable, the reason;
               (c)     if an infrastructure offset is applicable, the value of the infrastructure
                       offset.

11.4   Calculation of an infrastructure offset

       (1)     The value of an infrastructure offset for the trunk infrastructure contribution which
               is:
               (a)     land, is the planned estimate of the land; and
               (b)     work, is either of the following:
                        (i)       the planned estimate of the work (where agreed by both parties);
                       or
                       (ii)       the pre-market estimate of the work.
       (2)     The planned estimate of land or work for the trunk infrastructure contribution is
               the value of the establishment cost of the trunk infrastructure contribution item
               stated in the schedule of works which is calculated having regard to the following:
              (a)      if the trunk infrastructure contribution is for the whole of an item of trunk
                       infrastructure—the establishment cost of the trunk infrastructure in the
                       schedule of works for trunk infrastructure;
               (b)     if the trunk infrastructure contribution is for part of an item of trunk
                       infrastructure in the schedule of works for trunk infrastructure—the
                       proportion of the establishment cost of the trunk infrastructure in the
                       schedule of works for trunk infrastructure applicable to the trunk
                       infrastructure contribution having regard to the methodology used by the
                       Council for the calculation of the establishment cost in the schedule of
                       works for trunk infrastructure;
               (c)     if the trunk infrastructure is not in the schedule of works for trunk
                       infrastructure but the Council has determined that the land or work
                       delivers the same desired standard of service to the trunk infrastructure in




                               Council Resolution dated 6 February 2014
Log in to download the original file

2014-01-28 Planning & Organisation Committee Item 4.1 Attachment 1(PDF, 1MB).pdf · 1.4 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.