Noosa Shire Council
Adopted Infrastructure Charges Resolution (No. 1) 2014
(c) the claimant's estimate of the following:
(i) the planned estimate of the trunk infrastructure land contribution;
(ii) the planned or pre-market estimate of the trunk infrastructure
works contribution;
(iii) the value of the infrastructure offset for the trunk infrastructure
contribution.
(2) The Council is to give a notice in the prescribed form to the claimant which states
the following:
(a) whether an infrastructure offset is applicable or not;
(b) if an infrastructure offset is not applicable, the reason;
(c) if an infrastructure offset is applicable, the value of the infrastructure
offset.
11.4 Calculation of an infrastructure offset
(1) The value of an infrastructure offset for the trunk infrastructure contribution which
is:
(a) land, is the planned estimate of the land; and
(b) work, is either of the following:
(i) the planned estimate of the work (where agreed by both parties);
or
(ii) the pre-market estimate of the work.
(2) The planned estimate of land or work for the trunk infrastructure contribution is
the value of the establishment cost of the trunk infrastructure contribution item
stated in the schedule of works which is calculated having regard to the following:
(a) if the trunk infrastructure contribution is for the whole of an item of trunk
infrastructure—the establishment cost of the trunk infrastructure in the
schedule of works for trunk infrastructure;
(b) if the trunk infrastructure contribution is for part of an item of trunk
infrastructure in the schedule of works for trunk infrastructure—the
proportion of the establishment cost of the trunk infrastructure in the
schedule of works for trunk infrastructure applicable to the trunk
infrastructure contribution having regard to the methodology used by the
Council for the calculation of the establishment cost in the schedule of
works for trunk infrastructure;
(c) if the trunk infrastructure is not in the schedule of works for trunk
infrastructure but the Council has determined that the land or work
delivers the same desired standard of service to the trunk infrastructure in
Council Resolution dated 6 February 2014