                               Noosa Shire Council
              Adopted Infrastructure Charges Resolution (No. 1) 2014



              the schedule of works for trunk infrastructure—the methodology
              specified by the Council for the calculation of the establishment cost in
              the schedule of works for trunk infrastructure.
(3)   The pre-market estimate of work for the trunk infrastructure contribution is the
      estimate expressed in dollars of the design and construction of the work:
      (a)     including the following:
              (i)        the cost of planning and designing the work;
              (ii)       the cost of survey and site investigation for the work;
              (iii)      a cost under a construction contract for the work;
              (iv)       a portable long service leave payment for a construction
                         contract;
              (v)        an insurance premium for the work;
              (vi)       a Council inspection fee for the commencement and end of the
                         maintenance period for the work;
              (vii)      the cost of an approval for the work;
      (b)     excluding the following:
              (i)        a cost of carrying out temporary infrastructure;
              (ii)       a cost of carrying out other infrastructure which is not part of the
                         trunk infrastructure contribution;
              (iii)      a cost of the decommissioning, removal and rehabilitation of
                         infrastructure identified in paragraphs (i) and (ii);
              (iv)       a part of the trunk infrastructure contribution provided by the
                         Council or a person other than the person seeking the
                         infrastructure offset;
              (v)        a cost to the extent that GST is payable and an input tax credit
                         can be claimed for the work.
      (c)     The claimant
              (i)        must undertake a tender process in accordance with the
                         Council’s Procurement Policy for any work contribution which
                         is eligible for an Infrastructure Offset under this document;
              (ii)       must give the Council a Notice which states the claimant’s
                         calculation of the pre-market estimate, which will include, as
                         applicable;
                       A.        a copy of the tender advertisement;
                       B.        a copy of each tender received;




                      Council Resolution dated 6 February 2014
Log in to download the original file

2014-01-28 Planning & Organisation Committee Item 4.1 Attachment 1(PDF, 1MB).pdf · 1.4 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.