Council archive · source document
A6107 Lot9 Stormwater Management Plan (RevB) June 2022 · OPW22/0166
Plans and drawings: the text below has words only, no drawings.
Original PDF page 13, section 3. The text section number identifies this passage in the reader.
12
72
X
11
X
9.
3
PROPOSED SEDIMENT BASIN AREAS
.3
AD ) 9. EROSION AND SEDIMENT CONTROL DEVICES/STRATEGIES TO BE
>
12
X
1
6
S P OM
3
.2
46
.4
2
.0
12
COMPLETED PRIOR TO DISTURBANCE OF THE SITE, AND SHALL REMAIN IN
.2
10
9.
12
7
K
12
2
.9
N
OR .0 (
>
93
.0
150mm COMPACTED GRAVEL
11
t X
22 A
PLACE UNTIL PERMANENT WORKS ARE COMPLETE AND CATCHMENT
12
9.
X
HW L10
X |
65
| |
T R 48
HARDSTAND CBR15 VEGETATION IS ESTABLISHED (75% GRASS COVER MINIMUM) .
1
R
>
| |
.0
9.
EA VEL
6
.9
12
| |
36
11
PROPOSED PIT E
Em 6.
| |
34
X L
7
0
>
.2
X
7
.8
9.
0
| |
150mm CBR15 TEMPORARY PAVEMENT
20
10. AREAS OF WORKS THAT REQUIRE DISTURBANCE OF SOIL SHALL BE KEPT
.9
PROTECTION.
8
.9
10
12
X
.1
11
11
14.0
| |
6
12
7
ROCK DAM @ 30m CTS.
9
.6
.7
TO A MINIMUM TO LIMIT THE EXPOSURE OF SOIL TO RAIN-DROP IMPACT
.8
REFER DETAIL
|
RP
12
8 3
9
>
11
77
4
BIDIM A14 GEOFABRIC PINNED TO TEMP.
.7 1
|
7
.8
X | |
13 .83
9
1. REFER DETAIL DRG ESC02
9.
.3
10
| | 1DRG ESC02 AND OTHER FORMS OF WIND/STORMWATER EROSION.
13
13
BATTERS AS INDICATED
52
4
| |
X
.7
>
9.
8
7
11
3
.0
X
| |
.2
(EXTENT OF BATTER PROTECTION TO BE
.9
12
5
10
X
11
.6
|
4 1 11. ALL WORK IS TO BE COMPLETED IN ACCORDANCE WITH ALTA PROJECTS
13
9.
|
6
CONFIRMED ONSITE)
>
|
1
4
.8
.1
.8
STANDARD SPECIFICATION.
13
14
10
8.90 PROPOSED EARTHWORKS LEVEL
2
3
X
.1
X
.1
3
>
12
14
.7
PROPOSED SWALE TO DIVERT
X
7
X
.1
13
1
10
.2
X
99
SURFACE RUNOFF TO SEDIMENT
14
EXISTING SHEET PILING
>
2
9.
.2
X 98 TANK/PUMP ROOM
2
1
.0
14
.1
9. BASIN '1'
X6.10
1
11
14
.8
3
X EARTHWORKS PAD
.8
13
7
>
X
.1
CO
13
ALL WORKS TO BE CARRIED OUT IN STRICT
X PROPOSED TOP OF BATTER
10
4
| | | | | | | | | | | | | |
8
N LEVEL RL8.2 (NOM)
3
.1
8
(NO D
.0
.7
ARE SERV
A7
M)
X
.1
ACCORDANCE WITH APPROVED SETTLERS
10
10
RL1 RKS P11.1
12
5
2
13
>
.7
.1
X PROPOSED TOE OF BATTER
13
12
POOL AREA COVE NOOSA RESIDENTIAL HIGH DENSITY
A (P ATIO PROPOSED PIT
55
> > >
X
X
9.
OS
X
EARTHWORKS PAD
6
3
0.0
>>
CW N
ENVIRONMENTAL MANAGEMENT PLAN (EMP1)
X> >
606 PROPOSED SWALE
.0
.3
X PROTECTION.
46
LEV0.91 THWO
13
10
9.
LEVEL RL8.2 (NOM) DATED 21 JULY 2005 BY WBM OCEANICS.
P) > > REFER DETAIL
48
9
7
.3
.4
77
9.
X FINISHED SURFACE CONTOUR
12
13
EL
SP195871
9.
DRG ESC02
E1AR
X0
> >
0
X
9
>
.6
X
5.
11
X SEDIMENT BASIN '1'. EXISTING SURFACE CONTOUR
5
51
.0
> >
44
W Y (> IDE
99
13
9.
X
X | |
HABITAT PROTECTION FENCE TO BE ERECTED
9.
REFER DETAIL
IR 00)
5
2
9.
.5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
A6107 Lot9 Stormwater Management Plan (RevB) June 2022.pdfRelated documentApplication case desk ↗
About this file
- File size
- 6.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.