Council archive · source document
A6107 Lot9 Stormwater Management Plan (RevB) June 2022 · OPW22/0166
Plans and drawings: the text below has words only, no drawings.
Original PDF page 13, section 4. The text section number identifies this passage in the reader.
|
9.0
43
FLO NC 3m W
3
X > >
12
9. EXISTING ELECTRICAL RETICULATION
.0
E
WE Q1
PRIOR TO COMMENCEMENT OF CLEARING WORKS
X
||
11
RL
PROVIDE SIGNAGE AT 50m SPACINGS " ECOLOGICAL X > > ALL BATTER GRADIENTS
||
X T EXISTING TELSTRA RETICULATION
OV MER OSED
3
55
||
.0
RESTORATION AREA - NO ACCESS X
43
E 45 TO BE CONFIRMED BY
9.
10
| | | | | | | | | | | | |
3
9.
9.
EXISTING STORMWATER DRAINAGE
|
.0
D
ER GE
2
| |
X
.8
| |
|
E OP
11
X
| | | X
11
X X X X X GEOTECHNICAL ENGINEER
98
|
XX
PR
W EXISTING WATER RETICULATION
SP195871 X
5.
X X X X X
ESC03
ALL WORKS IN PROXIMITY OF RETAINED
S1
S EXISTING SEWER RETICULATION
TREES TO BE CARRIED OUT IN STRICT PROPOSED SWALE TO DIVERT
ACCORDANCE WITH ARBORISTS DIRECTIONS SURFACE RUNOFF TO SEDIMENT X X PROPOSED SILT FENCE (INCLUDING 2.0m
BASIN '1' ROCK DAM @ 30m CTS. WINGS AT 5.0m CENTRES)
INCOMING STORMWATER PIPE TO STOP
REFER DETAIL DRG ESC02 SHORT OF RIP. DISCHARGE TO SURFACE
OF TEMPORARY BASIN DURING INCOMING STORMWATER PIPE TO STOP ROCK DAM @ 30m CTS.
CONSTRUCTION WORKS. NO SHORT OF RIP. DISCHARGE TO SURFACE REFER DETAIL DRG ESC02
0 4 8 12 16 20m
CONNECTION UNTIL APPROVED IN OF TEMPORARY BASIN DURING
WRITING BY ENGINEER CONSTRUCTION WORKS. NO
PROPOSED PIT PROTECTION
CONNECTION UNTIL APPROVED IN SCALE 1:200 A1, 1:400 A3
WRITING BY ENGINEER
NOTE: ONLY DRAWINGS MARKED "FOR CONSTRUCTION" AND BEARING AN ORIGINAL SIGNATURE SHALL BE USED FOR CONSTRUCTION Design:
PURPOSES.
PBL PROJECT: DRAWING TITLE:
Brah 101 pty ltd t/a Alta Projects
Drawn: PBL
A.B.N. 91 611 354 511 EROSION AND SEDIMENT CONTROL
FOR APPROVAL Date: JUNE 2021 26 Memorial Avenue, Cotton Tree PROPOSED RESIDENTIAL DEVELOPMENT LOT 9
NOT FOR CONSTRUCTION PO Box 559, Cotton Tree, QLD, 4558 Revision Sheet
Checked:. . . . . . . . . . .
Tel (07) 5475 4125 Fax (07) 5479 1607 at SERENITY CLOSE, NOOSA DRAWING No:
A6107/22/L9/ESC01 A 1 of
STEVEN HARRISON
Email: [email protected]
A 20/06/2022 ISSUE FOR APPROVAL PBL S.H.
.......................
DIRECTOR APPROVAL Datum AHD
Web: http://www.alta.net.au for CAPE BOUVARD DEVELOPMENTS
REV DATE DESCRIPTION BY CHKD RPEQ - 4784 A1 SHEET SIZE Council
FILENAME : a6107-22-L9-ESC01.dwg - DATE : 20/6/22 - 12:46pm - XREF's: X-BASE; X-ARCH LOWER GROUND; X-ARCH UPPER GROUND; X-ARCH STG4B LANDSCAPE; X-ARCH STG4B LANDSCAPE LEVELS; X-ARCH STG4B LEVEL1; X-ARCH STG4B BASEMENT; X-SURVEY; X-LANDSCAPE LOWER;Ref:
X-LANDSCAPE UPPER; 2017008 landscape base; H-Approved-SH; H-Checked-SH
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
A6107 Lot9 Stormwater Management Plan (RevB) June 2022.pdfRelated documentApplication case desk ↗
About this file
- File size
- 6.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.