Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

2014-11-20 Ordinary Meeting Minutes

of 19

Page text shows just the words. Original shows the document exactly as it was published.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

ORDINARY MEETING MINUTES                                                   20 NOVEMBER 2014


         4     The applicant is advised that the development works for this permit may require
               payment of a compliance bond (to be determined in Operational Works Permit)
               in accordance with Council’s policies. The payment of the bonds will be
               required prior the prestart meeting for the Operation Works.
         5     The Building and Construction Industry (Portable Long Service Leave) Levy
               must be paid prior to the issue of a development permit where one is required
               for the 'Building and Construction Industry'. This applies to Building Works,
               Operational Works and Plumbing and Drainage Works applications, as defined
               under the Sustainable Planning Act 2009, where the works are $80,000 or more
               and matching the definition of 'Building and Construction Industry' under the
               Building and Construction Industry (Portable Long Service Leave) Act 1991.
               Council will not be able to issue a Decision Notice without receipt of details that
               the Levy has been paid. Should you require clarification in regard to the
               amendments to the Building and Construction Industry (Portable Long Service
               Leave) Act 1991, you should contact QLeave on 1800 803 481 (free call) or
               (07) 3212 6855

6   SEPTEMBER 2014 QUARTERLY BUDGET REVIEW
    Item not dealt with by Planning & Organisation Committee.              Referred to General
    Committee for consideration.
    Reason for referral: Significance of issue and request for a further report amending
    Attachment 1.

7   NOOSA NORTH SHORE LANDING GROUND TENURE AMENDMENT (LOT 7
    MCH4562)
    That Council note the report by the Property & Facilities Property Officer to the Planning &
    Organisation Committee dated 11 November 2014 and issue the Trustee Lease and the
    Trustee Licence areas to include infrastructure outside of the hangar footprints in
    accordance with a revised lease survey plan to be prepared by the two groups (as per
    Option 1 in the report):

    A.   Sunshine Coast Aviators Inc Trustee Lease (proposed lease area B) – over new
         hangar and new plumbing infrastructure; and
    B.   Sunshine Coast Model Flyers Inc Trustee Licence (proposed lease area A) – over
         existing hangar and existing plumbing infrastructure.

8   QUARTERLY OPERATIONAL PLAN PROGRESS REPORT
    That Council note the report by the Chief Executive Officer to the Planning & Organisation
    Committee Meeting dated 11 November 2014 providing an update on progress with the
    implementation of the Operational Plan to 30 September 2014 and details of Key
    Performance Indicators.




Noosa Shire Council                                                               Page 11 of 19
                       This is not an official copy of Council’s Minutes
Log in to download the original file

2014-11-20 Ordinary Meeting Minutes(PDF, 129KB).pdf · 132 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.