Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

2014-11-20 Ordinary Meeting Minutes

of 19

Page text shows just the words. Original shows the document exactly as it was published.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

ORDINARY MEETING MINUTES                                                  20 NOVEMBER 2014


         27.   Buildings, basements and other structures must maintain a minimum clearance
               of 1.5 meters from Unitywater sewer mains, and 1.0 meter from a sewer
               manhole chamber or sewer inspection opening.
         28.   Easements of between 3 and 10 metres must be provided over all Unitywater
               sewers located within property boundaries in accordance with the SEQ
               standards. Easements shall be centred over the pipe. Easement terms shall be
               the most current registered dealing held by the Department of Natural
               Resources & Mines and shall not be altered or amended.
         29.   Storm water retention systems and gross pollutant traps must maintain a
               minimum clearance of 1.5 meters from Unitywater water supply and sewerage
               infrastructure.
         30.   Tree plantings must maintain a minimum horizontal clearance of 1.0 metre from
               Unitywater water mains and 1.5 metres from Unitywater sewerage mains.
               Landscaping plants within these clearances must be low growing when mature,
               and suitable approved varieties.
         31.   Construction works undertaken in the vicinity of Unitywater water supply or
               sewerage infrastructure must not adversely affect the integrity of the
               infrastructure. All costs associated with repair, replacement or alteration of
               infrastructure must be met by the applicant.
         Advisory Notes
         Unitywater
         Connection to Unitywater live water mains and the Unitywater live sewer system must
         be undertaken by Unitywater at the applicant’s cost.
         A 150mm diameter water main is located within the road boundary fronting the
         development site in Rene Street. Construction works, heavy traffic crossing the main,
         excessive vibration and excavation close to the main may cause damage to the pipe.
         Extreme care is required when working close to this infrastructure. All costs
         associated with repair, replacement or alteration of infrastructure must be met by the
         applicant.

         Aboriginal Cultural Heritage Act 2003
         There may be a requirement to establish a Cultural Heritage Management Plan
         and/or obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH
         Act).
         The ACH Act establishes a cultural heritage duty of care which provides that: “A
         person who carries out an activity must take all reasonable and practicable measures
         to ensure the activity does not harm Aboriginal cultural heritage”. It is an offence to
         fail to comply with the duty of care. Substantial monetary penalties may apply to
         individuals or corporations breaching this duty of care. Injunctions may also be issued
         by the Land and Resources Tribunal, and the Minister administering the ACH Act can
         also issue stop orders for an activity that is harming or is likely to harm Aboriginal
         cultural heritage or the cultural heritage value of Aboriginal cultural heritage. You
         should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss
         any obligations under the ACH Act.
         Equitable Access and Facilities




Noosa Shire Council                                                              Page 16 of 19
                      This is not an official copy of Council’s Minutes
Log in to download the original file

2014-11-20 Ordinary Meeting Minutes(PDF, 129KB).pdf · 132 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.